BUSI 338 Week 4 New Venture Project Phase 2 Presentation Example

Reviewed by Thomas Kerrigan, MBA, CPA · Liberty University · Updated

This BUSI 338 Week 4 sample presentation is the project's second phase, built for the composite repair van Hill City Mobile Bike Works, and its management factor is operations: what the repair van buys, how much it carries and how the work is checked. Eleven slides with speaker notes use a log of the first 60 soft-launch repairs to sort parts into A, B and C groups, set reorder points that fit a van with limited shelf space, and build a five-step quality check for every bicycle. Research on inventory turnover in retail and on what customers mean by service quality supports the choices. Liberty University BUSI 338 assigns this 90-point BS in Business Administration phase in Module/Week 4, with chapter 13 of Byrd and Megginson.

CourseBUSI 338 Developing Entrepreneurial Opportunities (BUSI338)
Module/Week4
AssignmentNew Venture Project Phase 2 Presentation
Paper typePresentation (11 slides with speaker notes)
Lengthabout 1,065 words, 4 double-spaced pages plus title page and references. Course guide: a 10-12 slide PowerPoint on one management factor of the venture, based on competitive analysis and market research, with at least 2 outside references (1 peer-reviewed) and at least 1 biblical reference, in current APA format
FormatAPA 7 student paper
Points90
SchoolLiberty University Online
ProgramBS in Business Administration
Where it sitsModule/Week 4 in Liberty's published BUSI 338 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for BUSI 338 Week 4

1

Phase 2: Purchasing, Parts Inventory and Quality Control in a Repair Van

 

[Student Name]

School of Business, Liberty University

BUSI 338: Developing Entrepreneurial Opportunities

New Venture Project Phase 2 Presentation

[Instructor Name]

[Date]

 

The venture, its soft-launch job log, its parts counts and its supplier terms are composites written for this sample; the textbook, research and Scripture cited are real.

Why this part earns its pointsThe title slide names operations as the factor, keeping the phase on a single subject.
2

Phase 2: Purchasing, Parts Inventory and Quality Control in a Repair Van

Slide 1: Phase 2: Purchasing, Inventory and Quality Control

  • Inside the van: what we buy, stock and check
  • Factor covered: operations
  • New Venture Project, Phase 2

Speaker notes: Phase 1 set up the business legally and ethically. This phase covers what happens inside the van: which parts the business buys and from whom, how much of each it carries, and how every repair is checked before the bicycle goes back to its rider. The decisions rest on a log of the first 60 repairs from the soft launch with two workplace partners, which is the best market research a service business can have.

Slide 2: The Constraint: A Van Is Not a Store

  • Storefront shops stock thousands of parts and accessories
  • The van holds about 120 stock items on its shelves
  • Every slot must earn its place

Speaker notes: The four storefront shops in the area carry deep inventories, from tubes to complete wheelsets, and can usually finish any repair from stock. The van cannot. Its shelving holds roughly 120 different items. If the wrong parts fill those slots, a rider waits for a second visit, which defeats the purpose of a mobile service. Byrd and Megginson (2018) note that inventory is money sitting on a shelf, and in a van it is also space that cannot be added.

Why this part earns its pointsMarket research here is the venture's own job log, which is stronger than an assumption.
3

Slide 3: What 60 Repairs Used

  • 41 of 60 jobs used inner tubes or tires
  • 33 used brake pads or cables
  • 22 used a chain; 9 used a cassette or freewheel
  • 7 needed parts the van did not carry

Speaker notes: The job log recorded every part used in the soft launch. Tubes, tires, brake parts and chains appeared again and again. Cassettes, freewheels and bottom brackets appeared less often but cost more. Seven jobs needed a part the van did not have, mostly unusual sizes on older bicycles, and each required a second visit. Those seven second trips cost about three hours of labor and fuel, which is what the inventory plan must reduce.

Slide 4: ABC Groups

  • A: chains, cassettes, brake sets (few items, most money)
  • B: tires, common tubes, cables (moderate)
  • C: small hardware, ferrules, valve caps (many items, little money)

Speaker notes: Sorting parts by the money they tie up and how often they are used gives three groups. The A group is a small number of items that represent most of the inventory value, so it is counted weekly and ordered carefully. The B group is checked every two weeks. The C group is cheap, so the van simply carries plenty of it; running out of a ten-cent ferrule should never cancel a repair.

Slide 5: Reorder Points for A and B Items

  • Reorder point = daily use x lead time + safety stock
  • Example: chains, 0.8 a day x 3 days + 3 = about 6
  • Weekly order to the distributor every Monday

Speaker notes: For a chain, the log shows about four used each week, or 0.8 a working day. The distributor delivers in about three working days. Safety stock of three chains covers a busy week. So when the van is down to six chains, the next order includes more. Gaur et al. (2005) studied publicly listed U.S. retailers and found that inventory turnover varied widely between firms and was linked to gross margin, capital intensity and sales surprises. For a small van, faster turnover means less cash locked up and fresher stock, which is why the reorder points are kept low.

Slide 6: Choosing Suppliers

  • Primary: a national bicycle parts distributor, about 3-day delivery
  • Backup: a regional distributor for brands the first lacks
  • Avoid: online retail for stock, slow and inconsistent

Speaker notes: Byrd and Megginson (2018) describe purchasing as getting the right item, in the right quantity, at the right time and price. For this business, time matters as much as price. A national distributor with an account for licensed shops offers wholesale prices and delivery within about three days. A second distributor covers brands the first does not carry. Buying stock from online retailers was rejected because delivery times vary and the business needs predictable restocking.

Slide 7: Special Orders Without a Second Trip

  • Unusual parts: photographed and ordered during the first visit
  • Rider pays a deposit; part ships to the rider's home
  • Install on the next scheduled route nearby

Speaker notes: The van will never carry every part, so the plan handles the rest. When the log's seven unusual cases recur, the mechanic photographs the old part, orders the replacement on the spot and takes a deposit. The part ships directly to the rider, and the installation is scheduled on the next day the van is already in that neighborhood. This turns a wasted second trip into a planned stop on an existing route.

Why this part earns its pointsThe biblical reference governs the checklist itself, which is how faith shapes operations here.
4

Slide 8: The Five-Step Quality Check

  • Brakes: lever feel and stopping test
  • Drivetrain: shifts through every gear
  • Wheels: true, tight, inflated to rating
  • Bolts: torqued to spec
  • Test ride and signed checklist

Speaker notes: Every bicycle leaves the van with a signed five-step checklist taped to the handlebar. The steps cover the systems that keep a rider safe. According to Jesus, the person who can be trusted with very little can be trusted with much (English Standard Version Bible, 2001/2016, Luke 16:10). The bolt nobody sees is the one that decides whether the rider trusts the next repair. The checklist makes that standard part of the routine rather than something left to a busy afternoon.

Slide 9: How Riders Judge Quality

  • Reliability: the repair works and lasts
  • Responsiveness, assurance, empathy, tangibles
  • Reliability matters most to customers

Speaker notes: Berry et al. (1988) summarized their research on service quality in five dimensions customers use to judge a service, and reported that reliability, doing what was promised correctly the first time, was the one customers rated most important. For this business, that means a repair that holds is worth more than a friendly visit. The checklist protects reliability; arriving on time and explaining the work protect the other four dimensions.

Slide 10: Tracking Quality Over Time

  • Comeback rate: repairs redone within 30 days
  • Target: under 3 percent of jobs
  • Every comeback reviewed for its cause

Speaker notes: Quality control needs a number. The business will track comebacks, any bicycle that needs the same repair redone within 30 days. The target is fewer than three comebacks per hundred jobs. Each comeback is reviewed to find whether the cause was a part, a skipped step or a misdiagnosis, and the checklist or stock list is adjusted. Comebacks are fixed free, which keeps the incentive to get it right the first time with the business.

Slide 11: References

Speaker notes: The phase draws on the textbook, two journal articles, on inventory turnover and on service quality, and one passage of Scripture, listed in APA format below.

5

References

Berry, L. L., Parasuraman, A., & Zeithaml, V. A. (1988). The service-quality puzzle. Business Horizons, 31(5), 35-43. https://doi.org/10.1016/0007-6813(88)90053-5

Byrd, M. J., & Megginson, L. C. (2018). Small business management: An entrepreneur's guidebook (8th ed.). McGraw-Hill Education.

English Standard Version Bible. (2016). Crossway. (Original work published 2001)

Gaur, V., Fisher, M. L., & Raman, A. (2005). An econometric analysis of inventory turnover performance in retail services. Management Science, 51(2), 181-194. https://doi.org/10.1287/mnsc.1040.0298

What the BUSI 338 Week 4 instructions ask

Chapter 13 of Byrd and Megginson, on purchasing, inventory and quality control, is the only reading for Module/Week 4 besides a video, and Phase 2 of the New Venture Project is the only graded item, worth 90 points. As with every phase, the deck is 10 to 12 slides on one management factor of the venture, grounded in competitive analysis and market research. Two outside sources are the floor, one drawn from a peer-reviewed journal, and the slides need a biblical reference that fits their subject, all cited in current APA format. Students who chose a product business may focus on suppliers and stock; service ventures can treat parts and quality the same way.

How this BUSI 338 Week 4 example is built

The deck starts from data the venture actually has. A log of the first 60 soft-launch jobs shows which parts were used, and that log drives the ABC sort, the van's stock list and the reorder points. A competitive slide contrasts the van's small stock with a storefront shop's deep shelves, which is why purchasing must be disciplined. Supplier choice is explained by delivery speed, not just price. Quality gets three slides: the five-step check, how riders judge service, and how complaints are tracked. A verse from Luke on faithfulness in small things sits on the quality slide, where it sets the rule that every bolt is checked. A references slide lists the sources in APA.

BUSI 338 Week 4 grading rubric: where the points go

Instructors look for chapter 13 applied to the venture itself: real purchasing decisions, a defensible inventory method and a concrete quality control process, each shaped by research on competitors and customers. A deck that defines economic order quantity without using it earns less than one that sets a reorder point from the venture's own numbers. Market research counts most when it changes a decision, as the job log does here. Both outside references must be present, one peer-reviewed, and the biblical reference should govern a practice. Slides should stay within 10 to 12, and speaker notes should carry the reasoning and citations so the deck can stand on its own.

BUSI 338 Week 4 help: mistakes that cost points

Start with whatever data your venture can produce, even a small sample of expected orders or jobs, and build the inventory slides from it. Sort items by how much money they tie up and how often they are used, then decide how much of each to hold. Show the arithmetic for one reorder point so the method is visible. For suppliers, compare more than price: delivery time, minimum orders and return terms matter to a small firm. Make quality control a short checklist someone could follow. Search the Jerry Falwell Library for a peer-reviewed study on inventory or service quality, and let it shape one choice on the slides.

Related BUSI 338 sample papers

Other BUSI 338 weeks

More BS in Business Administration sample papers

BUSI 338 Week 4 questions, answered

What does the BUSI 338 Phase 2 presentation cover?

Phase 2 is the project's second slide deck, 10 to 12 slides on a single management factor, due in Module/Week 4 for 90 points; this sample covers purchasing, inventory and quality control from chapter 13.

Where can I find a free BUSI 338 Week 4 sample paper?

This page presents a complete BUSI 338 Week 4 slide deck with speaker notes on parts inventory and quality checks for a mobile bicycle repair business.

What is ABC inventory analysis?

A way of sorting stock into groups by value and use, so the few items that tie up the most money or are used most often get the closest control and the rest get simpler rules.

How do you set a reorder point for a small business?

Multiply average daily use by the supplier's lead time in days, then add safety stock for uncertainty; when stock falls to that level, place an order.

Is anything besides Phase 2 due in BUSI 338 Module/Week 4?

No other graded work is listed for Module/Week 4; students read chapter 13 of Byrd and Megginson, watch one video and submit the Phase 2 presentation.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.