In this MGMT 610 Week 5 example, Forum 3 of Liberty University MGMT 610 takes up procurement as a risk tool, the subject of the PMBOK Guide's chapter 12 and Wilson's fourth chapter, for 100 points in the MS in Project Management. The composite prompt asks how the choice of contract type moves risk between buyer and seller, and when transferring risk backfires. The thread answers from a 25-bed critical access hospital in the Nebraska Sandhills that bought a prefabricated MRI suite under a fixed-price contract and then found groundwater where the foundation was to go. Bajari and Tadelis's theory of fixed-price and cost-plus contracts, Ward, Chapman and Curtis on placing each risk where it can be controlled, and Osipova and Eriksson's study of joint risk management frame the analysis, with the parable of the vineyard workers on keeping an agreement.

CourseMGMT 610 Risk Management (MGMT610)
Module/Week5
AssignmentDB Forum 3
Paper typeDiscussion thread and replies
Lengthabout 990 words (thread and replies). Course guide: per the course guide, a 500-750-word thread with at least three peer-reviewed sources, one biblical integration and one text citation, plus replies to at least two classmates of 200-250 words each, each with a peer-reviewed source or a biblical integration in addition to a text
FormatAPA 7 citations and reference list
Points100
SchoolLiberty University Online
ProgramMS in Management and Leadership
Where it sitsModule/Week 5 in Liberty's published MGMT 610 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for MGMT 610 Week 5

1

Discussion Board Forum 3: Thread and Two Replies

MGMT 610 Risk Management, Discussion Board Forum 3 (thread and two replies)

Thread by [Student Name]

The prompt, the hospital's project and the classmates' posts are composites standing in for the course's own forum; the textbooks, the peer-reviewed studies and Scripture are real; the requirements follow Liberty's public course guide for MGMT 610.

Thread

Why this part earns its pointsThe thread starts from the reason the buyer chose fixed price, which sets up the question of what risk actually moved.
2

Our 25-bed critical access hospital in the Nebraska Sandhills spent two years raising money for its first MRI. Our current imaging consists of a mobile MRI trailer that visits two days a month, so patients with back injuries or suspected strokes travel ninety miles to the nearest scanner. The board chose a prefabricated MRI suite from a modular imaging vendor under a fixed-price contract of $2.9 million, because the foundation that had pledged most of the money wanted a firm number. The contract covered the module, shielding, installation and foundation. Three days into site work, the vendor's excavator struck groundwater four feet down. The contract's differing site conditions clause placed unknown subsurface conditions with the owner, and the dewatering, a raised foundation and a two-month delay added $310,000, which the hospital paid from its own reserves.

The PMBOK Guide describes fixed-price contracts as placing more risk on the seller and cost-reimbursable contracts as placing more on the buyer (Project Management Institute, 2017). Bajari and Tadelis (2001) explain why the choice should depend on the work. In their model, fixed-price contracts give sellers strong incentives to control cost but make changes expensive to negotiate, so they suit simple, well-defined projects, while cost-plus contracts suit complex projects in which changes are likely. Our project looked simple, a module set on a slab, but its foundation was not well defined because no one had drilled a boring. We bought a fixed-price contract for a project whose most uncertain part sat outside the price. In effect, the hospital paid the vendor's risk premium for the parts of the work that were predictable and kept the one risk that was not.

Why this part earns its pointsThe analysis names the principle the contract violated, then shows what the alternative would have cost, which is the critical step.
3

Ward et al. (1991) argued that a risk belongs with whichever party can best control or absorb it, and that pushing a risk onto a party with no control over it mostly buys higher bids or disputes. The groundwater risk could have been managed by either party only through investigation. A $6,000 geotechnical study before signing would have turned an unknown into a known, priced condition. Osipova and Eriksson (2013), studying two construction projects, found that joint risk management between client and contractor depended on collaboration and a willingness to share risk information, rather than on the formal contract alone. Our vendor's project manager later told us he had wondered about the water table but had not asked, since the clause protected his firm. Wilson (2015) treats procurement decisions as part of risk planning, and our plan had treated the contract as a substitute for one.

In Jesus's parable of the vineyard, workers hired early complained when latecomers received the same wage, and the landowner replied that he was treating them fairly, because a denarius was the wage they had accepted (English Standard Version Bible, 2001/2016, Matthew 20:13). A contract binds both sides to what they actually agreed, which is why a buyer must know what it is agreeing to. Our hospital kept its word and paid, but we now require a site investigation before any fixed-price construction contract is signed, and our risk register lists, for every contract, which risks the clauses actually leave with us.

Classmates: have you seen a contract clause send a risk back to the party that thought it had transferred it?

Reply to Olivia

Why this part earns its pointsThe reply tests the classmate's broad claim, that fixed price always protects the owner, with procurement theory.
4

Olivia, your thread argued that owners should use fixed-price contracts whenever possible, because the county you work for saved money on three road resurfacing projects that way. Your results make sense for that kind of work.

I would add a limit to the rule. In the model of Bajari and Tadelis (2001), a fixed price earns its keep when a project can be specified completely in advance, as resurfacing usually can. When a project is complex, the cost of renegotiating each change can outweigh the savings from strong incentives, which is why their model predicts cost-plus contracts for complicated work. Your county's planned courthouse renovation, which you mentioned at the end, may be a different case: old buildings hide conditions no drawing shows, from undocumented wiring to lead paint behind plaster. On that kind of project, a fixed-price bidder either prices every hidden condition into the bid or files change orders when they appear, and the county pays either way. The PMBOK Guide also lists hybrid forms, such as fixed price with economic price adjustment, that can share specific risks such as material escalation (Project Management Institute, 2017).

Wilson (2015) places procurement inside risk planning, which suggests choosing the contract after the risk register is drafted rather than before. Would the county consider a guaranteed maximum price with a shared contingency for the courthouse instead of a pure fixed price?

Reply to Sam

Why this part earns its pointsThis reply applies a risk allocation principle and Scripture to the classmate's overrun, keeping the tone constructive.
5

Sam, your account of the time-and-materials contract for the software consultants at your insurance company was candid: a twelve-week integration that ran to twenty-one weeks, with the consultants billing every hour. You concluded that time-and-materials contracts should be banned.

I think the problem may have been how the risk was allocated rather than the contract type itself. The allocation principle of Ward et al. (1991) asks who could actually control each risk. Under your contract, the consultants controlled the pace of work but bore none of the schedule risk, while your company bore all of it but could not direct the work day to day. A not-to-exceed cap or milestone payments, both common additions to time-and-materials contracts, would have given the consultants a stake in finishing. The PMBOK Guide also notes that time-and-materials arrangements suit work whose scope cannot be defined quickly (Project Management Institute, 2017), which may describe the discovery phase of your integration but not its later build.

Proverbs warns that a slack hand causes poverty while a diligent hand makes rich (English Standard Version Bible, 2001/2016, Proverbs 10:4). A contract can reward diligence or quietly reward slack, and a well-meaning team can drift toward whichever one the contract pays for.

Did the statement of work define milestones that payments could have been tied to?

6

References

Bajari, P., & Tadelis, S. (2001). Incentives versus transaction costs: A theory of procurement contracts. The RAND Journal of Economics, 32(3), 387-407. https://doi.org/10.2307/2696361

English Standard Version Bible. (2016). Crossway. (Original work published 2001)

Osipova, E., & Eriksson, P. E. (2013). Balancing control and flexibility in joint risk management: Lessons learned from two construction projects. International Journal of Project Management, 31(3), 391-399. https://doi.org/10.1016/j.ijproman.2012.09.007

Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.).

Ward, S. C., Chapman, C. B., & Curtis, B. (1991). On the allocation of risk in construction projects. International Journal of Project Management, 9(3), 140-147. https://doi.org/10.1016/0263-7863(91)90038-W

Wilson, R. (2015). Mastering risk and procurement in project management: A guide to planning, controlling, and resolving unexpected problems. Pearson FT Press.

What the MGMT 610 Week 5 instructions ask

The third forum of MGMT 610 opens in Module/Week 5, when procurement takes over the reading through the PMBOK Guide's twelfth chapter and Wilson's fourth, plus one presentation; nothing else is graded that week. Its rules are the course's standing forum rules. The thread must land between 500 and 750 words, demonstrate course knowledge, cite at least three peer-reviewed sources and at least one course text, and integrate Scripture at least once. Two or more replies follow, each 200 to 250 words, each pairing a text citation with either Scripture or a refereed study. Because the Risk Management Plan is due the next week, a Forum 3 thread that thinks carefully about risk response through contracts can feed directly into that plan.

How this MGMT 610 Week 5 example is built

The thread first describes the hospital's decision: a fixed-price contract with a modular imaging vendor for a $2.9 million MRI suite, chosen so that the hospital's board would know its cost. It then tells what happened when the vendor's excavator struck groundwater at four feet, and how the contract's differing site conditions clause sent the cost of dewatering and a raised foundation back to the hospital. Bajari and Tadelis's argument that fixed-price contracts suit simple, well-specified work explains the mismatch, and Ward and colleagues' rule that a risk should sit with whoever can control it shows what should have happened. Osipova and Eriksson's finding that joint risk management depends on collaboration closes the analysis, followed by the vineyard owner's question in Matthew 20.

MGMT 610 Week 5 grading rubric: where the points go

Forum 3 is graded on understanding of procurement as a means of responding to risk and on the quality of interaction. A strong thread explains how different contract types allocate risk, shows with a real project where the allocation worked or failed, and draws a lesson supported by research. Word count, the three refereed articles, the textbook citation and the Scripture are each verified against the guide, as are the replies' length and sources. Replies should engage a classmate's reasoning about contracts, for example by testing a claim that one type always protects the buyer. Using the contract vocabulary correctly, so that a guaranteed maximum price is not called a fixed price, accurate reporting of the studies, and correct APA citations show graduate work.

MGMT 610 Week 5 help: mistakes that cost points

A frequent mistake is treating risk transfer as risk removal. A fixed-price contract moves certain risks to the seller, but the seller prices them, and risks that neither party can foresee often return to the buyer through change orders or claims. Explain which risks moved and which did not. Another mistake is describing contract types in the abstract; anchor the discussion in one contract and its key clauses, such as differing site conditions or escalation. Use the PMBOK Guide's terms for contract types correctly. Keep the biblical integration tied to the ethics of agreements, such as honesty and keeping one's word. In replies, choose a single claim in each classmate's thread and test it against a study.

Related MGMT 610 sample papers

Other MGMT 610 weeks

More MS in Management and Leadership sample papers

MGMT 610 Week 5 questions, answered

What is MGMT 610 DB Forum 3?

Another 100-point forum, this one posted in Module/Week 5 while students read the PMBOK Guide on procurement, following the course rules for a 500-750-word thread and two 200-250-word replies.

Where can I find a free MGMT 610 Week 5 sample paper?

Read here a complete MGMT 610 Week 5 forum on contract type and risk transfer in a rural hospital's modular MRI suite, with replies to two classmates.

Does a fixed-price contract transfer all risk to the seller?

No; the seller prices the risks it accepts, and risks the contract leaves with the buyer, such as unknown site conditions, can return through change orders and claims.

Who should carry a project risk?

The classic answer from risk allocation research is whoever can control it or absorb it at least cost, which often means sharing a risk that neither side can manage alone.

When is a cost-plus contract better than fixed price?

Procurement theory suggests cost-reimbursable contracts suit complex or poorly defined work, where changes are likely, while fixed-price contracts suit simple, well-specified work.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.