NURS 718 Week 5 Case Study 3 on Evaluating a Telehealth Service Expansion Example

Reviewed by Rachel Stanton, MSN, RN · Liberty University · Updated

In this NURS 718 Week 5 sample, a DNP student analyzes the decision facing a rural health system six months after launching emergency telestroke: whether to extend the network with a telemedicine stroke nurse practitioner who would manage admitted stroke patients remotely, so that fewer are transferred. The analysis builds an evaluation framework from structure, process and outcome measures, examines what the first six months of data can and cannot show, anticipates how remote services shift workload onto nurses, and makes a recommendation with conditions. Case Study 3 closes the series of three case analyses in Liberty University NURS 718; it is worth 100 points and falls in Module/Week 5. Evidence includes a 2026 study of 1,237 telestroke patients managed by remote nurse practitioners or community neurologists and a heart failure study showing hidden nursing workload in remote programs.

CourseNURS 718 Informatics, Technology and Trends for Transforming Health Care (NURS718)
Module/Week5
AssignmentCase Study 3 on Evaluating a Telehealth Service Expansion
Paper typeCase study analysis (case questions answered in APA)
Lengthabout 1,214 words, 4 double-spaced pages plus title page and references. Course guide: a case study analysis in current APA that thoroughly addresses each case question, using the course textbooks and other sources as needed
FormatAPA 7 student paper
Points100
SchoolLiberty University Online
ProgramDNP
Where it sitsModule/Week 5 in Liberty's published NURS 718 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for NURS 718 Week 5

1

Case Study 3: Should the Telestroke Network Add a Remote Stroke Nurse Practitioner? Evaluating an Information System Expansion With Structure, Process and Outcome Measures

 

[Student Name]

School of Nursing, Liberty University

NURS 718: Informatics, Technology and Trends for Transforming Health Care

Case Study 3

[Instructor Name]

[Date]

 

The case organization, its data and the proposal are composites written for a model case analysis; the textbook, studies and Scripture cited are real.

Why this part earns its pointsA short case summary gives the analysis the facts every answer will use.
2

Case Study 3: Should the Telestroke Network Add a Remote Stroke Nurse Practitioner? Evaluating an Information System Expansion With Structure, Process and Outcome Measures

Case Summary

Six months after Shenandoah Valley Health connected its three emergency departments to a comprehensive stroke center's telestroke service, 41 patients have received a telestroke consultation and 17 have received thrombolysis. Median door-to-needle time at the two smaller hospitals fell from 74 to 58 minutes. However, 14 of the 17 thrombolysis patients were still transferred to the stroke center after treatment, mainly because no local physician felt comfortable managing them overnight. The stroke center now offers a second service: a telemedicine stroke nurse practitioner who would round remotely on admitted stroke patients each day and be available by video overnight, at an annual cost of about $180,000. The board has asked whether to add it.

Question 1: What Framework Should Guide the Evaluation?

Tan and Payton (2010) describe evaluation as a continuing part of the information system life cycle, not a single event after implementation. The model proposed by Donabedian (1988) offers a practical structure for evaluating a clinical information service by examining structure, process and outcome together.

DomainExample measures for the telestroke network and proposed NP service
StructureConnection uptime, cart availability, nurse training completion, NP coverage hours
ProcessDoor-to-needle time, telestroke consult start time, NIH Stroke Scale documented within 12 hours, dysphagia screening, cardiac monitoring for embolic stroke
OutcomeTransfers after thrombolysis, symptomatic hemorrhage, 30-day readmission, length of stay, patient and family satisfaction
BalancingBedside nurse workload, overtime, local physician burden, cost per avoided transfer

The fourth row matters as much as the first three. Balancing measures capture what an improvement might cost elsewhere in the system, and a service that keeps patients local but exhausts the night nurse is not a success. Most process measures can be drawn from the shared electronic record and the stroke registry the regional center already submits, while workload data will need a simple log kept by charge nurses for each stroke admission. Each measure should have one owner, a definition agreed with the stroke center and a reporting interval, so that the evaluation is built into routine operations rather than assembled at the end.

Why this part earns its pointsExplaining where each measure's data will come from shows the evaluation can actually be run, not only designed.
3

Question 2: What Do the First Six Months Show?

The emergency phase appears to be working: door-to-needle time fell by 16 minutes, a clinically meaningful improvement. The data cannot yet show outcomes such as disability, because the numbers are small and follow-up is short. The high transfer rate after thrombolysis points to a gap in the inpatient phase rather than the emergency phase, which is exactly what the proposed service addresses. Seventeen patients are too few to estimate effects precisely, so any decision should be framed as a test rather than a certainty. The six months also contain useful process signals. Of the 41 consultations, the hub's logs show that most began within ten minutes of the page, which suggests the emergency workflow is stable enough to build on. What the logs cannot show is whether the 14 transfers were clinically necessary or simply the only option available overnight; a chart review of those cases by the stroke coordinator would separate the two and give the pilot a true baseline. Six months of data can show where a system is failing even when they are too few to prove what will fix it.

Question 3: What Does the Evidence Say About Telemedicine Stroke NPs?

A 2026 prospective study at primary stroke centers without vascular neurologists compared inpatient stroke consultation by a stroke-trained telemedicine nurse practitioner from a comprehensive stroke center with in-person consultation by community general neurologists across 1,237 patients (Dusenbury et al., 2026). Nurse practitioners managed nearly all post-thrombolysis patients, documented the NIH Stroke Scale within 12 hours of admission more often (90.5% versus 69.7%), documented stroke mechanism far more often (92.6% versus 41.3%) and ordered extended cardiac monitoring for embolic stroke of unknown source more often. Thirty-day readmissions for new stroke events were lower with nurse practitioners but the difference was not statistically significant. The authors concluded that the model was feasible and improved adherence to core measures. The study was observational and the groups differed in age and disability, so it supports the model's quality without proving it prevents transfers in every setting. Two features of the study fit Shenandoah Valley Health closely: the hospitals had no vascular neurologist, and the remote nurse practitioners worked from a comprehensive stroke center that also provided emergency telestroke. That arrangement mirrors the proposal, since the same hub would supply both services and the inpatient team could see the emergency consultation notes. Tan and Payton (2010) describe information systems as most valuable when they connect decisions across the stages of care, and an inpatient service linked to the emergency one extends that connection past the first hour.

Why this part earns its pointsReporting the study's numbers and its design limits lets the evidence inform the decision without overstating it.
4

Question 4: What Unintended Effects Should Be Anticipated?

Remote services often move work rather than remove it. In a real-world comparison of heart failure care, patients managed with remote monitoring had more frequent and longer consultations, mostly with specialized nurse practitioners, with no difference in cardiologist time or readmissions (Nieuwenhuys et al., 2026). A remote stroke nurse practitioner would rely on bedside nurses to present patients on video, carry out neurological checks, run swallow screens and relay orders, so local nurses' workload would rise. Telestroke also raises the possibility of treating stroke mimics, which a 2026 review notes remain common among patients evaluated and treated through telestroke, although serious bleeding after treating a mimic is uncommon (Zhang et al., 2026). Both effects should be measured. A third effect is less visible. When local physicians hand overnight decisions to a remote clinician, their own confidence with stroke patients may fall further, making the system more dependent on the contract. The pilot should therefore include joint case reviews in which the hospitalists and the remote nurse practitioner discuss each admission, so that local skill grows alongside the service rather than shrinking behind it.

Why this part earns its pointsNaming who absorbs the new work, and whose skills might erode, is the part of an evaluation most often left out.
5

Question 5: What Should the Board Decide?

The board should approve a twelve-month pilot of the telemedicine stroke nurse practitioner service at the community hospital first, with four conditions. Success criteria should be set in advance: a reduction in post-thrombolysis transfers by at least half and stable or improved core measure compliance. Bedside nurse staffing should be adjusted for stroke admissions, with workload tracked. The contract should include data sharing so outcomes can be measured. And the board should review results at six and twelve months, deciding whether to expand to the critical access hospital. The cost of $180,000 should be compared with the cost of transfers avoided and with revenue retained when patients stay local. If the community hospital avoids even a third of last year's transfers, the savings in ambulance costs and the admissions kept in the system would likely offset much of the fee, although the finance office should model this with its own figures before the board votes. The contract should also allow the system to end the service at twelve months without penalty if the success criteria are not met. Zaccagnini and White (2017) describe the DNP as a leader who translates evidence into practice and then evaluates the result; in this case, that means the DNP should chair the pilot's evaluation group and present its findings to the board.

Christian Reflection

Scripture repeatedly condemns dishonest scales, treating a false measure as a wrong against God and neighbor alike (English Standard Version Bible, 2001/2016, Proverbs 20:10). In an evaluation, the temptation is not usually fraud but selective reporting, celebrating the faster treatment times while leaving the nurses' extra hours out of the report. Measuring honestly, including the workload a new service places on nurses and the possibility of harm, is part of using an information system faithfully rather than promoting it.

Conclusion

The telestroke network has improved emergency treatment times, and its failure point now lies in inpatient care. Evidence supports remote stroke nurse practitioners as a way to deliver guideline-based inpatient care where neurologists are scarce. The board should test the service through a conditional pilot evaluated with structure, process, outcome and balancing measures.

6

References

Donabedian, A. (1988). The quality of care: How can it be assessed? JAMA, 260(12), 1743-1748. https://doi.org/10.1001/jama.1988.03410120089033

Dusenbury, W., Swatzell, V. M., Krishnaiah, B., Elangovan, C., Nearing, K., Alexandrov, A. V., & Alexandrov, A. W. (2026). Impact of telemedicine stroke nurse practitioner care on inpatient management in vascular neurologist underserved primary stroke centers. Stroke: Vascular and Interventional Neurology, 6(5), Article e002313. https://doi.org/10.1161/SVIN.125.002313

English Standard Version Bible. (2016). Crossway. (Original work published 2001)

Nieuwenhuys, W. W., van Leunen, M. M. C. J., van de Pol, J. A. A., Hafkamp, F. J., Spee, R. F., Tio, R. A., Funk, M., & Kemps, H. M. C. (2026). Real-world impact of remote patient management on care consumption and care time in heart failure: Retrospective cohort study. JMIR Formative Research, 10, Article e89187. https://doi.org/10.2196/89187

Tan, J. K. H., & Payton, F. C. (2010). Adaptive health management information systems: Concepts, cases, and practical applications (3rd ed.). Jones and Bartlett.

Zaccagnini, M. E., & White, K. W. (Eds.). (2017). The doctor of nursing practice essentials: A new model for advanced practice nursing (3rd ed.). Jones & Bartlett Learning.

Zhang, W., Wang, L., Ren, S., Yang, Z., Wu, G., & Gao, K. (2026). Telestroke systems and thrombolysis decisions: Diagnostic uncertainty, treatment thresholds, and stroke mimics. Frontiers in Neurology, 17, Article 1889300. https://doi.org/10.3389/fneur.2026.1889300

What the NURS 718 Week 5 instructions ask

Case Study 3 is the final case analysis in NURS 718. As with the first two, the student addresses every case question thoroughly in current APA, using the textbooks and other sources as needed. The Week 5 readings in Tan and Payton concern the later stages of the information system life cycle, including how systems are evaluated and improved once they are running, so this case asks how an organization should judge an existing system and decide whether to expand it, using its own early data. A strong analysis uses a recognized evaluation framework, distinguishes what the available data can show from what they cannot, anticipates unintended effects and recommends a decision with the conditions that should govern it.

How this NURS 718 Week 5 example is built

After a brief case summary, five questions are answered in turn. The first proposes an evaluation framework using structure, process and outcome measures, laid out in a table. The second interprets the first six months of telestroke data and names their limits. The third reviews evidence on telemedicine stroke nurse practitioners, and the fourth considers unintended effects, especially workload shifting to bedside nurses. The fifth makes a recommendation to proceed with a twelve-month pilot under specific conditions. A closing reflection on faithful measurement and a conclusion follow, so the analysis ends with a decision the board can act on.

NURS 718 Week 5 grading rubric: where the points go

The last case analysis is assessed like the first two: every question answered thoroughly, course concepts applied to the case facts, recommendations justified, sources used well and APA correct. Because this case concerns evaluation, instructors also look for a framework that organizes measures logically, for honest interpretation of limited data and for attention to unintended consequences. A recommendation framed as a conditional pilot, with specific measures and decision points, shows more mature judgment than a simple yes or no, and it demonstrates the evaluative competence the DNP Essentials expect. Numbers from the case should appear in the answers, and each source should be reported with its design limits rather than as settled proof.

NURS 718 Week 5 help: mistakes that cost points

Evaluation cases often go wrong when students list every possible metric without a framework, or treat six months of data from one network as proof that an expansion will work. Others focus entirely on patient outcomes and miss the effect on nursing workload, which remote programs often increase. Some recommendations ignore cost or contracts. Choose a framework, sort your measures into it, state what your data can and cannot support, look for who absorbs new work, and recommend a pilot with explicit success criteria and a date to decide. A short paragraph comparing the service's price with the cost of transfers it might prevent gives the board a financial anchor.

Related NURS 718 sample papers

Other NURS 718 weeks

More DNP sample papers

NURS 718 Week 5 questions, answered

What is NURS 718 Case Study 3?

It is the last of the three NURS 718 case analyses, worth 100 points in Module/Week 5, and this one asks how a running information system should be judged and whether it should grow.

Where can I find a free NURS 718 Week 5 sample paper?

You can read the whole NURS 718 Week 5 case analysis here, from the case summary and evaluation table through the pilot recommendation and APA references, without paying.

What is the Donabedian model?

Avedis Donabedian's quality framework judges care by three linked elements: the setting and resources available, the activities clinicians carry out, and the effects on patients' health.

Do telemedicine stroke nurse practitioners provide good care?

A 2026 study of 1,237 patients found remote stroke NPs documented stroke severity and mechanism and ordered recommended cardiac monitoring more often than community neurologists.

Do remote monitoring programs increase nursing workload?

They can. A 2026 heart failure study found more and longer nurse practitioner consultations with remote management, without a difference in readmissions.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.