This MGMT 690 Week 7 example is the Capstone Research Paper, the 250-point final paper of Liberty University MGMT 690, the course that closes Liberty's project management master's. The guide asks for fifteen to twenty pages on an industry the student chooses, summarizing its current status and proposing a project management office, with sections on leadership, teamwork, planning, evaluation and sustainability, all viewed through a Christian worldview, and at least twenty references. This sample studies U.S. commercial construction, an industry facing shortages of skilled trades, volatile material prices, fragile supply chains and rising demands for sustainability, and proposes a PMO for a composite 300-person general contractor. Drawing on research on PMOs, the PMO is designed around estimating support, standard methods, portfolio review and lessons learned, and rolled out in three phases with change management built in.

CourseMGMT 690 Capstone, Project Management (MGMT690)
Module/Week7
AssignmentCapstone Research Paper
Paper typeCapstone research paper with abstract
Lengthabout 3,044 words, 11 double-spaced pages plus title page and references. Course guide: per the course guide, a 15-20-page research paper on an industry of the student's choosing that summarizes its current status and suggests implementing a PMO, with sections on leadership, teamwork, planning, evaluation and sustainability evaluated through a Christian worldview, a title page, abstract and reference page, and at least 20 references, at least 10 of them scholarly, including the Bible, the PMBOK Guide and the textbook
FormatAPA 7 student paper
Points250
SchoolLiberty University Online
ProgramMS in Project Management
Where it sitsModule/Week 7 in Liberty's published MGMT 690 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for MGMT 690 Week 7

1

Building the Builders: The State of U.S. Commercial Construction and a Project Management Office for a Mid-Size General Contractor

 

[Student Name]

School of Business, Liberty University

MGMT 690: Capstone, Project Management

Capstone Research Paper

[Instructor Name]

[Date]

 

The industry analysis rests on published research; the mid-size contractor and its figures are a composite standing in for an organization the student chooses; the requirements follow Liberty's public course guide for MGMT 690.

2

Building the Builders: The State of U.S. Commercial Construction and a Project Management Office for a Mid-Size General Contractor

Abstract

Why this part earns its pointsThe abstract states the industry, the problem, the proposal and the conclusion in one paragraph, as an APA abstract should.
3

U.S. commercial construction delivers schools, hospitals, offices and plants through temporary project organizations that change with every job, and the industry's persistent problems, cost overruns, schedule delays and thin margins, are in large part project management problems. This paper summarizes the industry's current status, drawing on recent research on skilled labor shortages, material price volatility, supply chain disruption and building information modeling, and proposes a project management office for a composite 300-person general contractor. Research on PMOs shows that they vary widely and that their value depends on fitting their functions to the organization, so the proposed PMO is built around the contractor's specific weaknesses: estimating, inconsistent methods, weak portfolio decisions and lessons that are never reused. The paper examines leadership, teamwork, planning, evaluation and sustainability as they bear on the PMO, evaluates each through a Christian worldview, and proposes a three-phase rollout managed as an organizational change. It concludes that a support-oriented PMO, introduced with the project managers rather than imposed on them, can improve both project outcomes and the contractor's ability to learn.

Introduction

Construction is a project industry. Almost all of a general contractor's work comes packaged as one-time jobs, each with its own scope, calendar and money, and nearly every one of its people works on several such efforts over a year. That makes the discipline of project management central to the industry's results, and it makes the industry's familiar troubles, jobs that finish late, budgets that are exceeded, rework and disputes, in large part troubles of project management. The Project Management Institute (2017) describes a project management office as an organizational structure that standardizes project governance processes and facilitates the sharing of resources, methods, tools and techniques. This paper argues that a PMO, designed around a contractor's specific weaknesses and introduced as a change with the people it serves, can address several of the industry's chronic problems. The argument has a practical limit as well as a promise: a PMO cannot make skilled trades more plentiful or materials cheaper, but it can help a company plan for those conditions, choose its work more wisely and learn from each project instead of repeating its mistakes. It first summarizes the industry's current status, then makes the case for a PMO, describes a proposed PMO for a mid-size general contractor, examines the project management topics the guide names, and closes with a plan for introducing the PMO.

The Current Status of U.S. Commercial Construction

Why this part earns its pointsThe industry section relies on recent peer-reviewed studies for each trend, which meets the guide's call for the industry's current status.
4

Four conditions shape the industry today. The first concerns people. Across a large set of projects and an expert panel, Elbashbishy and El-adaway (2024) ranked the trades that carry most of a building's labor and found the scarcest workers among plumbers and electricians, the crafts a hospital or school needs in quantity. A companion study warns against treating that scarcity as national: because tradespeople seldom relocate for work, Shiha and El-adaway (2025) found shortages that vary sharply from one metropolitan market to the next, and they proposed an index, built from employment and earnings data, to gauge how severe a given market's shortage is. A contractor bidding in two cities may therefore face two different labor markets on the same day.

The second condition is unstable pricing. Rather than trying to predict where steel or concrete prices will go, Jezzini et al. (2025) set out to estimate how much budget risk those swings create for a whole job, combining deep-learning forecasts of producer price indexes with stochastic modeling and testing the method on a bridge replacement and a major roadway. The question they answer, how likely a project is to blow its budget because of materials, is the question a contractor faces every time it signs a guaranteed maximum price long before its purchases are made.

The third condition is the fragility of supply. A bibliometric review by Baghalzadeh Shishehgarkhaneh et al. (2024), covering a quarter century of work on construction supply chain risk, shows the field moving beyond spotting and scoring risks toward deciding who should carry them, which come first and how a project recovers, with artificial intelligence tools joining surveys and case studies. Long lead times for electrical gear, elevators and curtain wall now set the critical path on many commercial buildings.

The fourth condition is technological change. Bryde et al. (2013), analyzing 35 case studies of building information modeling, found that the benefit most often reported was reduced cost and better cost control across the project life cycle, with time savings also common, while the most frequent problems involved software. Building information modeling has become routine on large projects, but its benefits depend on coordinated processes that many mid-size contractors have not built.

These conditions share a feature: each raises the cost of poor project management. Labor shortages make estimating errors more expensive, price volatility punishes weak risk planning, supply chain delays expose poor scheduling, and building information modeling rewards organizations whose methods are consistent across projects. That is the case for an organizational response rather than a project-by-project one.

The Case for a Project Management Office

PMOs are common in construction and elsewhere, but research warns against treating them as a single known remedy. The first phase of the PMO research program led by Hobbs and Aubry (2007) found the field without agreement on how these offices should be built, which jobs they should do or what they are worth. Aubry et al. (2007) treated the PMO as one moving part in a company's wider project management arrangements, molded by history and context, which accounts for why many PMOs are restructured every few years. Dai and Wells (2004) explored how PMO features, such as developing standards and methods, keeping project history archives and providing training and consulting, relate to project performance. Taken together, these studies suggest a practical rule: a PMO should be designed around the organization's actual problems, and its value should be measured by whether those problems improve.

The Organization and Its Problems

The organization in this paper is a composite general contractor with about 300 employees and $420 million in annual revenue, building schools, medical offices, light industrial buildings and public facilities in a three-state region, mostly under construction-manager-at-risk and design-build contracts. Interviews with its leaders and a review of its last forty projects suggest four problems. Estimating is inconsistent: preconstruction estimates on similar buildings vary by as much as 15 percent depending on the estimator, and three of the last forty projects lost money because of estimating misses. Methods differ by project manager: each uses personal schedule templates, risk lists and closeout routines, so lessons do not transfer and new project managers learn by trial. Portfolio decisions are informal: the company bids on nearly every opportunity its executives like, with no review of whether it has the people to staff the work. And lessons learned are recorded in closeout reports that no one reads.

The Proposed PMO

Why this part earns its pointsThe PMO's functions are chosen one by one from the problems above, which is the link between industry analysis and proposal the guide asks for.
5

The proposed PMO is support-oriented rather than controlling, with five functions matched to the four problems.

ProblemPMO functionFirst-year measure
Inconsistent estimatesHistorical cost database and an estimating review for bids over $10 millionEstimate variance on similar buildings below 7 percent
Methods differ by project managerStandard schedule, risk and closeout templates; training for new project managersAll new projects using standard templates
Informal bid decisionsMonthly portfolio review of pipeline against staffing capacityNo project started without a named project manager and superintendent
Lessons not reusedLessons register and quarterly lessons sessionTen lessons applied to new bids
Weak building information modeling coordinationModel coordination standards and a shared coordinatorClash detection completed before construction on all eligible projects

Reporting to the chief operating officer, the PMO would start small, with a director, two estimating analysts and a coordination specialist, growing only as its services prove useful. It would arrive in stages. During its first half year it would deliver the cost database, estimating review and templates; in months seven to twelve, the portfolio review and lessons register; and in the second year, training for new project managers and model coordination. Each phase would end with a review of its measures before the next began.

Staffing, Cost and Governance of the PMO

The PMO's first-year cost would be about $610,000: salaries and benefits for the director, two estimating analysts and a coordination specialist, software for the cost database and lessons register, and training time. That figure is small beside the company's recent losses. The three projects that lost money because of estimating misses cost the company about $2.9 million in combined margin, so preventing one such miss every two years would more than pay for the office. The return should still be demonstrated, not assumed, which is why each function carries a first-year measure.

Governance would keep the office accountable and useful. The director would report quarterly to the executive team on the measures in the table, on the services project managers used and on the requests the office declined. A small advisory group of three project managers and two superintendents, rotating each year, would review the office's priorities, so that the people it serves have a formal voice in what it does. Any proposal to add a controlling function, such as approval of change orders, would go to the advisory group before the executive team, which guards against the drift from support to control that research on PMOs describes.

Risk Management Through the PMO

The industry conditions described earlier are risks that individual projects cannot manage alone. A single project manager cannot change the regional supply of electricians or the price of steel, but the company can decide how much of that exposure to accept across its portfolio. The PMO would keep a company-level register of these risks, updated monthly from the projects, and would bring it to the portfolio review. If three projects scheduled for the same quarter all depend on scarce electrical crews, the review can stagger their starts, negotiate earlier subcontracts or decline a fourth bid. If steel prices are rising, the review can ask estimators to price escalation clauses into new bids. The PMBOK Guide distinguishes risks at the project level from those that require escalation beyond a project's authority (Project Management Institute, 2017), and the PMO gives escalated risks a place to go. Research on construction supply chain risk, which has moved from identification toward allocation and recovery (Baghalzadeh Shishehgarkhaneh et al., 2024), supports giving these decisions to a body that sees all of the company's projects at once.

Technology and Information

Building information modeling and the company's project management software produce large amounts of data that are rarely used beyond the project that created them. The case studies reviewed by Bryde et al. (2013) found cost and time benefits from modeling, and those benefits depend on coordination standards that a single project team cannot impose on its designers and subcontractors. The PMO's coordination specialist would maintain those standards, run clash detection on eligible projects and archive each project's final quantities and costs into the historical database, linking the company's modeling work to its estimating. Over five years, the database would become the company's most valuable planning asset, a record of what its buildings actually cost, organized so that estimators can find it.

Leadership

Leadership determines whether a PMO serves project managers or polices them. Eva et al. (2019), reviewing twenty years of research on servant leadership, characterize it as leadership oriented to the people led, their development and welfare, and beyond them to the community, and they report its association with outcomes such as follower performance and helping behavior, while cautioning that most of the studies measure everything at a single point in time. A servant-oriented PMO director would measure success by whether project managers find the office useful, ask what help they need before building new tools, and give credit for improvements to the teams that make them.

From a Christian worldview, this approach reflects Jesus's reversal of rank, in which the greatest among his followers is the one who serves, a teaching he grounded in his own purpose of giving himself for others (English Standard Version Bible, 2001/2016, Matthew 20:26-28). A PMO with organizational authority could easily become one more layer of control; leadership that follows this teaching uses the office's position to equip others.

Teamwork

Construction projects depend on teams assembled for one job from people who may never have worked together: the contractor's staff, designers, subcontractors and the owner's representatives. Hoegl and Gemuenden (2001), studying 145 teams, measured teamwork quality along six dimensions, from how members communicate and coordinate to how evenly they contribute, back one another up, invest effort and hold together, and linked it to project success and to team members' satisfaction and learning. A PMO can support teamwork without managing teams directly, by standardizing kickoff meetings that clarify roles across companies, by providing shared coordination tools, and by keeping a record of which superintendents, project managers and subcontractors work well together.

Paul's picture of the church as a single body built from many parts that cannot say to one another "I have no need of you" offers a Christian frame for project teams drawn from different organizations (English Standard Version Bible, 2001/2016, 1 Corinthians 12:14-21). A team assembled from competing firms can still work as one body when each member's contribution is valued and coordinated.

Planning

Planning in construction suffers from a persistent optimism. Flyvbjerg (2006) argues that inaccurate forecasts of project cost and schedule arise from optimism bias and strategic misrepresentation, and his remedy, reference class forecasting, anchors an estimate in what comparable completed jobs actually cost and took. The proposed PMO's historical cost database is a reference class in practice: when an estimator prices a new medical office building, the database shows what the company's last six medical offices actually cost per square foot, adjusted for location and date. The PMBOK Guide describes planning as establishing the total scope of the effort, defining objectives and developing the course of action (Project Management Institute, 2017), and the PMO's templates would make that course of action consistent across projects.

Scripture commends careful planning while warning against presumption. A proverb sets diligent planning, which ends in plenty, against hurry, which ends in want (English Standard Version Bible, 2001/2016, Proverbs 21:5), and James warns against boasting about tomorrow (English Standard Version Bible, 2001/2016, James 4:13-16). A plan built from honest data about past projects honors both teachings.

Evaluation

Contractors usually evaluate projects by profit margin and schedule, but research suggests broader measures. Atkinson (1999) described budget and schedule as guesses fixed when the least is known and quality as a matter of opinion, and he asked for measures of what projects actually do for their organizations and the people around them. In the view of Shenhar et al. (2001), a project should be judged first on efficiency, then on its value to the customer, later on what it does for the business and finally on how it readies the firm for what comes next. For the contractor, a project that met its margin but strained an owner relationship, or that taught nothing to the next team, has succeeded only partly. Anbari (2003) describes earned value management as integrating scope, cost and schedule to show performance trends and forecast completion, and the PMO would introduce simple earned value reporting on all projects above $5 million so that a slipping job shows itself in the monthly numbers rather than at closeout.

The PMO's own value should be evaluated the same way. Its first-year measures are set out in the table above, and its director would report them to the executive team each quarter. In biblical terms, evaluation is a form of faithful stewardship: Paul reminded the Corinthians that stewards are required to be found faithful (English Standard Version Bible, 2001/2016, 1 Corinthians 4:2), and an office that cannot show its value should be changed.

Sustainability

Sustainability is no longer peripheral to construction. Silvius and Schipper (2014), reviewing the literature on sustainability in project management, found that considering sustainability changes the way projects are scoped, managed and evaluated, extending attention from the project's delivery to its social and environmental effects. Martens and Carvalho (2017), surveying project managers, identified four groups of factors in sustainable project management: sustainable innovation in the business model, stakeholder management, economic and competitive advantage, and environmental policies and saving resources. For the contractor, the PMO can support sustainability by tracking waste diversion and energy performance on each project, by building sustainability requirements into estimating so that they are priced rather than added late, and by sharing lessons from projects that pursued green building certification.

Genesis gives the first human the double task of cultivating the garden and guarding it (English Standard Version Bible, 2001/2016, Genesis 2:15), a calling that joins productive work with care for creation. A construction company that builds well while wasting less and caring for the communities around its sites lives out that calling in a practical way.

Introducing the PMO as a Change

The PMO is itself a change, and it will fail if it is imposed. For Hornstein (2015), project management and the management of organizational change can no longer be practiced apart, since any change in how people work needs deliberate attention to those people. Jarocki (2011) makes a similar case for unifying project and change management into a single method. The rollout therefore begins with conversations: the PMO director would meet each project manager and superintendent before designing any tool, ask which problems cost them the most, and invite volunteers to help build the first templates and the cost database. Early successes, such as an estimate corrected before bid day, would be shared widely. Measures would be reported honestly, including those that show little improvement, so that the office earns trust rather than demanding it.

Limitations

This proposal rests on a composite organization and on research that, as PMO scholars themselves note, does not settle what PMOs are worth. Its first-year measures are estimates of what a support-oriented office could achieve, not predictions, and some benefits, such as better portfolio decisions, may take longer than a year to show. The industry research cited here comes largely from the last five years, during an unusually volatile period for labor and materials, and conditions may ease or worsen. For these reasons the proposal builds in phase reviews and an advisory group, so that the company can change course if the office is not helping.

Conclusion

Commercial construction faces skilled labor shortages, volatile prices, fragile supply chains and rising expectations for coordination and sustainability, and each of these raises the cost of weak project management. Research on PMOs shows that their value depends on fitting their functions to an organization's real problems. For a mid-size general contractor, a support-oriented PMO focused on estimating, standard methods, portfolio review, lessons learned and model coordination can address the weaknesses that most often turn good projects into losses. Leadership that serves, teamwork across company lines, honest planning, broad evaluation and attention to sustainability give that PMO its character, and a Christian worldview gives each of them a deeper purpose. Introduced with the project managers rather than over them, the PMO can help the company build not only better buildings but a better organization.

6

References

Anbari, F. T. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12-23. https://doi.org/10.1177/875697280303400403

Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337-342. https://doi.org/10.1016/S0263-7863(98)00069-6

Aubry, M., Hobbs, B., & Thuillier, D. (2007). A new framework for understanding organisational project management through the PMO. International Journal of Project Management, 25(4), 328-336. https://doi.org/10.1016/j.ijproman.2007.01.004

Baghalzadeh Shishehgarkhaneh, M., Moehler, R. C., Fang, Y., Aboutorab, H., & Hijazi, A. A. (2024). Construction supply chain risk management. Automation in Construction, 162, Article 105396. https://doi.org/10.1016/j.autcon.2024.105396

Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of Building Information Modelling (BIM). International Journal of Project Management, 31(7), 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001

Dai, C. X., & Wells, W. G. (2004). An exploration of project management office features and their relationship to project performance. International Journal of Project Management, 22(7), 523-532. https://doi.org/10.1016/j.ijproman.2004.04.001

Elbashbishy, T., & El-adaway, I. H. (2024). Skilled worker shortage across key labor-intensive construction trades in union versus nonunion environments. Journal of Management in Engineering, 40(1), Article 04023063. https://doi.org/10.1061/JMENEA.MEENG-5649

English Standard Version Bible. (2016). Crossway. (Original work published 2001)

Eva, N., Robin, M., Sendjaya, S., van Dierendonck, D., & Liden, R. C. (2019). Servant leadership: A systematic review and call for future research. The Leadership Quarterly, 30(1), 111-132. https://doi.org/10.1016/j.leaqua.2018.07.004

Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5-15. https://doi.org/10.1177/875697280603700302

Hobbs, B., & Aubry, M. (2007). A multi-phase research program investigating project management offices (PMOs): The results of phase 1. Project Management Journal, 38(1), 74-86. https://doi.org/10.1177/875697280703800108

Hoegl, M., & Gemuenden, H. G. (2001). Teamwork quality and the success of innovative projects: A theoretical concept and empirical evidence. Organization Science, 12(4), 435-449. https://doi.org/10.1287/orsc.12.4.435.10635

Hornstein, H. A. (2015). The integration of project management and organizational change management is now a necessity. International Journal of Project Management, 33(2), 291-298. https://doi.org/10.1016/j.ijproman.2014.08.005

Jarocki, T. L. (2011). The next evolution: Enhancing and unifying project and change management. Brown & Williams Publishing.

Jezzini, Y., Assaad, R. H., & El-adaway, I. H. (2025). Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7), Article 04025071. https://doi.org/10.1061/JCEMD4.COENG-16055

Martens, M. L., & Carvalho, M. M. (2017). Key factors of sustainability in project management context: A survey exploring the project managers' perspective. International Journal of Project Management, 35(6), 1084-1102. https://doi.org/10.1016/j.ijproman.2016.04.004

Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.).

Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699-725. https://doi.org/10.1016/S0024-6301(01)00097-8

Shiha, A., & El-adaway, I. H. (2025). Localized multivariate statistical assessment of United States construction labor shortages. Journal of Construction Engineering and Management, 151(8), Article 04025097. https://doi.org/10.1061/JCEMD4.COENG-15702

Silvius, A. J. G., & Schipper, R. P. J. (2014). Sustainability in project management: A literature review and impact analysis. Social Business, 4(1), 63-96. https://doi.org/10.1362/204440814X13948909253866

What the MGMT 690 Week 7 instructions ask

Module/Week 7 of MGMT 690 belongs to the 250-point Capstone Research Paper, the largest grade in the course, with a presentation and a website as the week's resources. The guide asks for fifteen to twenty pages on an industry of the student's choosing. The paper must summarize the current status of the industry and suggest implementing a project management office, and it must contain sections on key project management topics, including leadership, teamwork, planning, evaluation and sustainability, each evaluated through a Christian worldview. Front and back matter matter too: the guide requires the paper to open with a title page and abstract and to close with its references. At least twenty references must be included, at least ten of them scholarly, and the guide counts the Bible, the PMBOK Guide and the course textbook among them. Students select their industry in Module/Week 2, so the research can build across five modules.

How this MGMT 690 Week 7 example is built

After its abstract, the sample's introduction states the argument: commercial construction's chronic problems are project management problems, and a well-designed PMO can address several of them. A section on the industry's status reviews research on scarce trades, unstable material prices, fragile supply chains and building information modeling. The case for a PMO follows, grounded in Hobbs and Aubry's and Dai and Wells's studies of what PMOs do. The proposed PMO's functions, structure and three-phase rollout are then set out with a table. Sections on leadership, teamwork, planning, evaluation and sustainability each apply research to the contractor and close with a Christian perspective, and a section on managing the PMO's introduction as a change draws on Hornstein and Jarocki before the conclusion.

MGMT 690 Week 7 grading rubric: where the points go

Above all, graders ask whether the capstone pulls the whole program together. Graders look for an accurate, current summary of the chosen industry supported by research; a PMO proposal that follows from the industry's problems and from PMO research, with functions, structure and implementation; and the required sections on leadership, teamwork, planning, evaluation and sustainability, each connected to the PMO and evaluated through a Christian worldview rather than closed with a verse. The reference requirement is checked, at least twenty with at least ten scholarly, as are the title page, abstract and reference page. A clear argument carried from introduction to conclusion, correct use of PMBOK Guide terms, and current APA format within fifteen to twenty pages complete the evaluation.

MGMT 690 Week 7 help: mistakes that cost points

Weak MGMT 690 capstones offer an industry overview and a PMO description that never meet. Let the industry's specific problems choose the PMO's functions, and say so explicitly. Use current research for the industry's status, since the guide asks for its current state, and check that statistics come from the sources cited. Write the five required topic sections about the PMO and the organization, not as general essays on leadership or teamwork. Give each section its own Christian worldview reflection tied to that topic. Plan the twenty references early; scholarly articles must make up at least half. Write the abstract last, about 150 to 250 words, and keep the body within twenty pages.

Related MGMT 690 sample papers

Other MGMT 690 weeks

More MS in Project Management sample papers

MGMT 690 Week 7 questions, answered

What is the MGMT 690 Capstone Research Paper?

The 250-point paper due in Module/Week 7: fifteen to twenty pages on an industry the student chooses, summarizing its current status and proposing a PMO, with sections on leadership, teamwork, planning, evaluation and sustainability.

Where can I find a free MGMT 690 Week 7 sample paper?

A complete MGMT 690 Week 7 capstone paper on U.S. commercial construction and a proposed PMO for a mid-size general contractor is reproduced on this page.

How many references does the MGMT 690 capstone paper need?

At least twenty, with at least ten scholarly sources; the guide counts the Bible, the PMBOK Guide and the course textbook among the twenty.

What should a PMO proposal include?

The organization's problems the PMO will address, the functions chosen to address them, its structure and staffing, how it will be introduced, and how its value will be measured.

What sections must the MGMT 690 capstone include?

Sections on key project management topics such as leadership, teamwork, planning, evaluation and sustainability, each evaluated through a Christian worldview, along with a title page, abstract and references.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.