| Course | MGMT 651 Agile Project Management (MGMT651) |
|---|---|
| Module/Week | 2 |
| Assignment | DB Forum 2 |
| Paper type | Discussion thread and replies |
| Length | about 905 words (thread and replies). Course guide: per the course guide, a thread of at least 400 words with at least four citations in current APA, plus replies to two classmates of at least 200 words each with at least two citations each |
| Format | APA 7 citations and reference list |
| Points | 50 |
| School | Liberty University Online |
| Program | MS in Project Management |
| Where it sits | Module/Week 2 in Liberty's published MGMT 651 course guide; current sections can differ |
| Updated | October 2026 |
Free sample paper for MGMT 651 Week 2
Discussion Board Forum 2: Thread and Two Replies
MGMT 651 Agile Project Management, Discussion Board Forum 2 (thread and two replies)
Thread by [Student Name]
The prompt, the device startup and the classmates' posts are composites standing in for the course's own forum; Gido and colleagues' textbook, the Scrum Guide, the published studies and Scripture are real; the requirements follow Liberty's public course guide for MGMT 651.
Thread
Our startup has twelve people building a pendant that detects falls among older adults living alone and calls for help. Our first plan was sequential: three months to design the hardware, two to write the detection algorithm, two to build prototypes and one to test them with older adults. When we finally ran lab trials with volunteers falling onto mats arranged as rugs, chairs and bathroom floors, the algorithm caught only 52 percent of falls and raised false alarms when wearers sat down quickly. Seven months of work had produced a device we could not sell, and we learned it in month eight. Our investors asked a fair question: why had no one tested the algorithm on real falls in month two?
The problem was that we had treated discovery work as if it were defined work. A defined process, like assembling the pendant once its design is final, produces predictable results from known inputs. Detecting falls is different: no one could know in advance how real people's movements would look to our sensors. Takeuchi and Nonaka (1986), describing how leading companies developed new products, compared their approach to a rugby scrum, with overlapping phases and a team that moves forward together, rather than a relay in which each phase hands off to the next. Our relay had passed the algorithm to testing far too late.
We moved to two-week Scrum sprints, and every sprint now ends with fall trials and a review with a geriatric physical therapist who advises us. The Scrum Guide describes Scrum as founded on empiricism, with three pillars: transparency, inspection and adaptation (Schwaber & Sutherland, 2020). Each sprint makes our detection rate visible, inspects it against new kinds of falls, and adapts the algorithm. After six sprints, the detection rate reached 91 percent with far fewer false alarms. Moe et al. (2010), in a case study of a Scrum team, found that self-management suffered when members worked as specialists in separate areas, which weakened the shared commitment Scrum relies on. We saw the same risk: our firmware and data science specialists at first worked in parallel, and we improved only after pairing them on each sprint's fall scenarios. Gido et al. (2018) describe the project life cycle as moving from initiation through planning and execution to closing, and Scrum keeps that life cycle at the level of the release while repeating a small cycle every two weeks.
A proverb ties lasting plans to the advice gathered before acting (English Standard Version Bible, 2001/2016, Proverbs 20:18). Empirical process control is a disciplined way of seeking counsel, from data and from the people the work is meant to serve, every two weeks instead of once at the end.
Classmates: what part of your current project behaves like a defined process, and what part only reveals itself as you go?
Reply to Brenda
Brenda, your thread compared the daily safety huddles on your hospital unit to Scrum's daily stand-up, and the comparison is a good one. Both are short, regular and focused on what is blocking the work today, and both depend on people speaking up about problems early.
I would add one distinction. The Scrum Guide describes the daily scrum as an inspection of progress toward a specific sprint goal, followed by adaptation of the plan for the next day (Schwaber & Sutherland, 2020). Your huddles inspect safety conditions, which is valuable, but your unit's improvement projects may not have a sprint goal for the huddle to inspect. Takeuchi and Nonaka (1986) emphasized that teams in their rugby approach shared a clear, challenging goal set by management while working out the means themselves.
A sprint goal also changes what the huddle is for: instead of reporting conditions, the team would be checking progress against a promise it made to itself two weeks earlier. Your unit's falls reduction project could be a natural test: a two-week goal, such as having every high-risk patient's bed alarm checked at each shift change, would give the huddle something specific to inspect and the team a reason to adapt the plan. Would your nurse manager be open to setting two-week goals for that project?
Reply to Kevin
Kevin, your thread argued that your plant should run its packaging line with Scrum, holding sprint reviews every two weeks. I admire the energy behind the idea, and your line's quality problems, nearly two percent of cartons relabeled by hand, sound frustrating.
I wonder whether the packaging line itself is a defined process. It turns known inputs into the same output thousands of times a day, which is the kind of work a fixed, standardized procedure suits. Gido et al. (2018) distinguish projects, which are temporary efforts with unique outcomes, from ongoing operations, and Scrum was built for projects whose details only emerge as the work proceeds. Where agile may fit is in your improvement project to reduce mislabeled cartons: the causes are not yet known, so short cycles of trying a fix, measuring and adapting would make sense there. Conforto et al. (2014) reported that firms beyond the software world tend to blend agile practices with their existing methods, and your plant sounds like a candidate for exactly that blend.
Standard work on the line would then give the improvement team a stable baseline to measure each sprint's change against, which is exactly what empirical control needs. Could your team run the mislabeling project in sprints while leaving the line's standard work as it is?
References
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014). Can agile project management be adopted by industries other than software development? Project Management Journal, 45(3), 21-34. https://doi.org/10.1002/pmj.21410
English Standard Version Bible. (2016). Crossway. (Original work published 2001)
Gido, J., Clements, J., & Baker, R. (2018). Successful project management (7th ed.). Cengage Learning.
Moe, N. B., Dingsøyr, T., & Dybå, T. (2010). A teamwork model for understanding an agile team: A case study of a Scrum project. Information and Software Technology, 52(5), 480-491. https://doi.org/10.1016/j.infsof.2009.11.004
Schwaber, K., & Sutherland, J. (2020). The Scrum guide: The definitive guide to Scrum: The rules of the game. https://scrumguides.org/
Takeuchi, H., & Nonaka, I. (1986). The new new product development game. Harvard Business Review, 64(1), 137-146.
What the MGMT 651 Week 2 instructions ask
Module/Week 2 of MGMT 651 assigns chapters 2 and 3 of Gido and colleagues, five presentations and a website, and grades this 50-point forum alongside two Mindtap quizzes. The forum's terms repeat each week of the course. Every thread in MGMT 651 needs four or more citations set in APA style across a minimum of 400 words, and in the same week each student answers two classmates in replies of 200-plus words carrying a pair of citations. The course description lists the relationship between defined and empirical processes among its core topics, and this early forum is where many students first explain why agile methods rest on empirical control, the practice of inspecting results frequently and adapting the work, instead of on a detailed plan fixed at the start.
How this MGMT 651 Week 2 example is built
The thread opens with the startup's first plan: eight months of design, build and test in sequence, with the detection algorithm finished before any older adult wore the device. Lab trials then showed the algorithm catching only 52 percent of falls with simulated rugs, chairs and bathroom floors. The thread explains why a defined process failed for this work and how the team moved to empirical control, with two-week sprints that each ended in fall trials and a review with a geriatric physical therapist. Takeuchi and Nonaka's description of overlapping development phases, the Scrum Guide's pillars, and Moe and colleagues' finding that specialization weakened a Scrum team's self-management explain the change. Gido and colleagues' life cycle frames it. Replies address hospital huddles and a factory line.
MGMT 651 Week 2 grading rubric: where the points go
Two things decide the Forum 2 grade, command of the week's ideas and the guide's numbers: at least 400 words and four APA citations in the thread, and at least 200 words and two citations in each of two replies. Strong threads define defined and empirical process control accurately, explain why some work cannot be fully specified in advance, and show how inspection and adaptation work in a real project. Using the Scrum Guide and the research correctly, including Scrum's roles and events, shows command of the material. Replies score when they check whether a classmate's process is really defined or empirical and for adding sources. A biblical reference that bears on planning and adjustment, and correct APA format throughout, finish the forum.
MGMT 651 Week 2 help: mistakes that cost points
Threads on this topic often equate empirical process control with having no plan. Scrum teams plan constantly, sprint by sprint and release by release; what differs is that the plan is expected to change as the team learns. Make that point with a project where early results changed the work. Define the terms using the course readings or the Scrum Guide rather than a website summary. Count your citations carefully, four for the thread and a further two inside every reply, with no source counted twice. Do not overstate what the research shows; case studies describe what happened in particular teams. In replies, ask whether the classmate's process produces predictable outputs from known inputs, which is the test for a defined process.
Related MGMT 651 sample papers
Other MGMT 651 weeks
- MGMT 651 Week 1: Forum 1: Agile or Plan-Driven
- MGMT 651 Week 3: Forum 3: User Stories, Backlog
- MGMT 651 Week 4: Agile Project Plan Outline
- MGMT 651 Week 5: Forum 5: Self-Organizing Teams
- MGMT 651 Week 6: Forum 6: Story Point Estimates
- MGMT 651 Week 7: Agile Project Plan
- MGMT 651 Week 8: Forum 8: Agile Beyond Software
More MS in Project Management sample papers
- MGMT 527 Week 2: Forum 1 Replies: Conflict, Cohesion
- MGMT 620 Week 2: Forum 1: Defining Project Success
- MGMT 625 Week 2: Forum 1 Replies and Reflection Blog
MGMT 651 Week 2 questions, answered
What is MGMT 651 DB Forum 2?
Forum 2 carries 50 points in Module/Week 2, thread and two replies together, following the same rules of a 400-word thread with four citations and 200-word replies with two each.
Where can I find a free MGMT 651 Week 2 sample paper?
A complete MGMT 651 Week 2 forum on empirical process control and Scrum at a startup building a fall-detection pendant, with two replies, appears on this page.
What is the difference between defined and empirical process control?
A defined process produces predictable results from known inputs and can follow a fixed plan; an empirical process is controlled by frequent inspection of results and adaptation, because outcomes cannot be predicted in advance.
What are the three pillars of Scrum?
The Scrum Guide names transparency, inspection and adaptation as the pillars of empiricism on which Scrum rests, so that the team and stakeholders can see the work, check it often and change course.
Where did Scrum come from?
Its name traces to a 1986 Harvard Business Review piece in which Takeuchi and Nonaka likened product teams to a rugby scrum, and Schwaber and Sutherland later developed it into a framework for software and other complex work.
Use it as a model, or ask for your own
This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.