BUSI 419 Week 6 Discussion Board Forum 6 Example

Reviewed by Laura Hargrove, MPH · Liberty University · Updated

This BUSI 419 Week 6 sample thread examines the plan, do, study, act cycle, the improvement method most health care organizations claim to use and few apply as designed. A primary care clinic labeled its overhaul of patient check-in a PDSA project, but it changed everything at once, made no predictions and measured nothing until the end. A systematic review of 120 PDSA projects found that almost all reported success while only 4% followed all four key features of the method, and a blood culture project that cut contamination from 10.7% to 3.4% shows what disciplined cycles can do. The thread rebuilds the clinic's effort as a series of small tests with predictions and weekly data. Zechariah's word about not despising small beginnings frames the method. Replies address speed and writing measurable aims. Liberty University BUSI 419 pairs this healthcare administration forum with the IHI improvement capability modules.

CourseBUSI 419 Management of Quality Improvement and Outcomes (BUSI419)
Module/Week6
AssignmentDiscussion Board Forum 6
Paper typeDiscussion thread with two replies
Lengthabout 955 words (thread and replies). Course guide: a thread of 300 to 500 words with at least one Scripture reference, one scholarly source and the textbook, plus replies to 2 classmates of 250 to 350 words each
FormatAPA 7 citations and reference list
Points50
SchoolLiberty University Online
ProgramBS in Healthcare Administration
Where it sitsModule/Week 6 in Liberty's published BUSI 419 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for BUSI 419 Week 6

1

Discussion Board Forum 6: Rapid-Cycle Improvement With Plan, Do, Study, Act

BUSI 419 Management of Quality Improvement and Outcomes, Discussion Board Forum 6

Thread by [Student Name]

The clinic, its project and the classmates are composites; the textbook, Scripture and the peer-reviewed sources cited are real.

Why this part earns its pointsThe thread opens with a project that used the PDSA name without its features, the pattern the research describes.
2

Last year our primary care clinic redesigned patient check-in to shorten waits. Leaders called it a PDSA project, but on a single Monday they introduced a new kiosk, a revised intake form, a second front desk position and text reminders asking patients to arrive early. No one wrote down what they expected to happen, and the only measure was a patient survey three months later. When wait times barely changed, no one could say which of the four changes had helped, hurt or done nothing. Lighter (2011) presents rapid-cycle improvement as a way to learn from small, deliberate tests, which is the opposite of changing everything at once and hoping.

Why this part earns its pointsThe review supplies the scale of the problem, so the clinic's story reads as typical rather than unusual.
3

Our experience is common. Knudsen et al. (2019) examined 120 PDSA-based improvement projects published in 2015 and 2016 and found that 98% reported improvement, yet only 27% described a specific, numerical aim and reached it. Only 60% documented their cycles well enough to analyze, and just 4% followed all four key features: repeated cycles, continuous data collection, small-scale testing and a stated rationale for each change. When nearly every project succeeds on paper but few follow the method, the reported successes deserve less trust.

By contrast, Bothra et al. (2026) used a fishbone analysis to find why blood cultures at their hospital were being contaminated and then applied PDSA cycles: training on aseptic technique, supervised collection and direct feedback to staff whose samples grew contaminants. Across 7,329 specimens, contamination fell from 10.7% to 3.4%. The method worked because the problem was analyzed first and each change was tied to a cause.

If we redid our check-in project, I would run three sequenced tests. First, text reminders for one physician's patients for two weeks, predicting a 20% drop in late arrivals. Second, if that worked, the revised intake form at one desk, predicting a two-minute reduction in check-in time. Third, the kiosk for returning patients only. Each test would be measured weekly on a run chart, and each would be adopted, adapted or abandoned based on what the data showed, before the next began. A PDSA cycle without a prediction is not a test; it is a guess with paperwork.

Zechariah asks who has despised the day of small things (English Standard Version Bible, 2001/2016, Zechariah 4:10). Small tests can seem too modest to matter, but they are how lasting improvement is built.

Reply to Kendra

Kendra, you wrote that PDSA cycles feel too slow for your hospital's leadership, which wants to see results within a quarter. I understand the pressure, but I would argue that small tests are usually faster than large rollouts in the end. A large change that fails, as our clinic's check-in redesign did, costs months and leaves no clear lesson, while a two-week test that fails costs two weeks and teaches something specific. Knudsen et al. (2019) found that most published projects reported improvement but very few could show they had met a specific aim, which suggests that rushing to a large change often produces claims rather than results. Lighter (2011) describes rapid-cycle improvement as a way to speed learning, and cycles can be very short, sometimes a single shift or a single day for a simple change. Bothra et al. (2026) achieved a large drop in contamination over a period of months by layering one change on another, each built on what the last had shown. To satisfy leaders who want quick results, you might present a 90-day plan with three or four cycles, each with its own prediction and a weekly measure displayed on a run chart. Leaders would then see progress every week instead of waiting for a final report. Would your leadership accept a plan that promises learning every two weeks and a measurable result by the end of the quarter? Framing PDSA as a schedule of quick wins may turn the perceived slowness into an advantage. It also protects leaders from the embarrassment of announcing a large change that later has to be quietly reversed, which tends to cost far more credibility than a small test that did not pan out.

Reply to Andrew

Andrew, you mentioned that your team struggled with the first question of the Model for Improvement, what are we trying to accomplish, and ended up with an aim to improve discharge efficiency. That is a common place to get stuck, and it matters, because a vague aim makes every later step harder. Knudsen et al. (2019) found that only about a quarter of published PDSA projects stated a specific, numerical aim and reached it, which suggests that weak aims are one of the method's most common failures. A strong aim usually names the measure, the size of the change, the population and the deadline. For your project, that might read: increase the share of medical unit patients discharged before noon from 25% to 40% by the end of June. Lighter (2011) emphasizes that a measure is only useful when its definition leaves no room for different people to count differently, so your team would also need to agree on what counts as a discharge time, such as the moment the patient leaves the unit. Bothra et al. (2026) defined contamination clearly as the growth of skin organisms in a culture, which let them compare periods with confidence. Once the aim is set, the team can choose a small first test, such as having one unit's case manager begin discharge planning at morning rounds for a week. What number would your team consider a meaningful improvement in discharge timing? Agreeing on that figure early will make every later conversation about success much easier. It also helps to add a balancing measure, such as readmissions within a week, so that faster discharges do not quietly create a new problem elsewhere.

4

References

Bothra, M., Ghuliani, R., Swarup, P., Majumder, S., Jain, A., & Verma, S. (2026). Decreasing contamination rates in blood cultures: A plan-do-study-act approach. The National Medical Journal of India, 39, 303-305. https://doi.org/10.25259/NMJI_801_2024

English Standard Version Bible. (2016). Crossway. (Original work published 2001)

Knudsen, S. V., Laursen, H. V. B., Johnsen, S. P., Bartels, P. D., Ehlers, L. H., & Mainz, J. (2019). Can quality improvement improve the quality of care? A systematic review of reported effects and methodological rigor in plan-do-study-act projects. BMC Health Services Research, 19(1), 683. https://doi.org/10.1186/s12913-019-4482-6

Lighter, D. E. (2011). Advanced performance improvement in health care: Principles and methods. Jones and Bartlett Publishers.

What the BUSI 419 Week 6 instructions ask

Two items are graded in Module/Week 6 of BUSI 419, which assigns chapter 6 of Lighter, a presentation and two websites. The first is the set of IHI Improvement Capability modules, whose completion certificates students save from IHI and post to the course. The second is Forum 6. Keep the thread inside the 300 to 500 word window and support it, as always, with the textbook, a scholarly study and Scripture; then write two peer responses that each run from 250 to 350 words. The IHI modules teach the Model for Improvement closely, which makes this forum a good place to test that model against a real project.

How this BUSI 419 Week 6 example is built

The sample thread starts with a clinic that called a sweeping redesign a PDSA project even though it skipped the method's essential steps. It uses a systematic review of published PDSA projects to show how common that pattern is and why it undermines confidence in the results. A hospital project that reduced blood culture contamination through root cause analysis, training, supervision and feedback illustrates disciplined use of the method. The thread then rebuilds the clinic's project as three small, sequenced tests, each with a prediction and a measure. Zechariah's line about the day of small things frames the value of starting small. The replies address concerns about speed and how to write an aim.

BUSI 419 Week 6 grading rubric: where the points go

In Forum 6, faculty generally look for an accurate account of the PDSA cycle, including prediction, small-scale testing, iterative cycles and data collected over time, and for a thread that applies those features to a real or realistic project. The strongest threads show where a project went wrong and how to fix it, with the reading, a study and Scripture each doing real work in the argument. Responses should add evidence or practical guidance rather than praise. APA formatting, attention to the word limits and a professional tone complete the expectations, and a mention of what the IHI modules added shows the two assignments working together.

BUSI 419 Week 6 help: mistakes that cost points

Choose an improvement project you have seen, and ask whether it followed the PDSA method or simply used the name. Read chapter 6 and draw on the IHI modules for the Model for Improvement's three questions, which ask for an aim, a way of measuring and a specific change to try. Find a peer-reviewed article that evaluates how PDSA is used or reports a well-run project. Redesign your example as small tests with predictions. Link patient, steady improvement to a verse. In replies, help a classmate sharpen an aim or plan a first test, and suggest a measure they could track weekly. A worked example of a strong aim statement is often the most useful thing a reply can offer.

Related BUSI 419 sample papers

Other BUSI 419 weeks

More BS in Healthcare Administration sample papers

BUSI 419 Week 6 questions, answered

What is BUSI 419 Discussion Board Forum 6?

The 50-point Module/Week 6 forum in BUSI 419, based on chapter 6 of Lighter, in which students discuss improvement methods such as PDSA and respond to two classmates.

Where can I find a free BUSI 419 Week 6 sample paper?

This page includes the complete BUSI 419 Week 6 thread on using plan, do, study, act cycles correctly, with two replies of at least 250 words and APA references.

What are the key features of a PDSA cycle?

A prediction stated before testing, small-scale tests, repeated cycles that build on each other and data collected over time, often monthly or more often, to judge each change.

Do PDSA projects actually improve care?

Most published projects report improvement, but a review of 120 found only 27% stated a specific numerical aim and met it and only 4% followed all four key features of the method.

What else is due in BUSI 419 Module/Week 6?

The IHI Improvement Capability modules are due as well; students complete them online through IHI and upload proof of completion, which is graded apart from Forum 6.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.