| Course | BUSI 313 Foundations of Project Management (BUSI313) |
|---|---|
| Module/Week | 1 |
| Assignment | Discussion Board Forum 1 Thread |
| Paper type | Discussion thread |
| Length | about 374 words (thread and replies). Course guide: a thread of 300 to 500 words demonstrating course-related knowledge, referencing at least 2 peer-reviewed sources and including 1 biblical integration |
| Format | APA 7 citations and reference list |
| Points | 50 |
| School | Liberty University Online |
| Program | BS in Business Administration |
| Where it sits | Module/Week 1 in Liberty's published BUSI 313 course guide; current sections can differ |
| Updated | October 2026 |
Free sample paper for BUSI 313 Week 1
Discussion Board Forum 1 Thread: Why Projects Fail to Meet Their Budgets
BUSI 313 Foundations of Project Management, Discussion Board Forum 1 Thread
Thread by [Student Name]
The forum prompt is a composite of the kind the course poses; the textbook, research and Scripture cited are real.
Projects run over budget for two main reasons: some estimates are made optimistic on purpose, and many are optimistic without anyone intending it. Larson and Gray (2018) explain that organizations select projects by comparing their expected costs and benefits with strategic goals, which means a low estimate can be the difference between a project being approved or rejected. That pressure shapes estimates before a single task begins.
The deliberate cause is well documented. Flyvbjerg et al. (2002) looked at 258 roads, bridges, tunnels and rail lines built over seven decades; nearly nine in ten came in above their approved cost, and rail schemes overran by roughly 45 percent on average. Because the errors pointed overwhelmingly in one direction and had not improved over seventy years, the authors concluded that they were best explained by strategic misrepresentation, project promoters understating costs to win approval, rather than by honest mistakes. An estimate that is wrong in the same direction every time is not a forecast; it is a sales pitch.
The psychological cause affects even honest planners. Buehler et al. (1994) asked students to predict when they would finish academic projects and found that most finished later than predicted, even though they knew their past projects had run late. People focused on how the task should go and ignored their own history. Project teams do the same when they build schedules from best-case task durations.
Scripture teaches a different discipline. Proverbs advises preparing one's work outside and getting everything ready in the field before building one's house (English Standard Version Bible, 2001/2016, Proverbs 24:27). Preparation includes honest counting, and honesty in estimates is part of a project manager's stewardship of the resources others entrust.
Two practical steps follow. First, compare new estimates with the actual costs of similar past projects rather than with the plan alone. Second, separate the people who estimate from the people who need the project approved, or at least require an independent review of major estimates. Neither step is expensive, and both put the project manager's credibility on the side of accurate numbers. A sponsor who learns early that a project will cost more can decide whether it is still worth doing; a sponsor who learns halfway through has fewer choices left.
References
Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366-381. https://doi.org/10.1037/0022-3514.67.3.366
English Standard Version Bible. (2016). Crossway. (Original work published 2001)
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279-295. https://doi.org/10.1080/01944360208976273
Larson, E. W., & Gray, C. F. (2018). Project management: The managerial process (7th ed.). McGraw-Hill Education.
What the BUSI 313 Week 1 instructions ask
BUSI 313 opens with chapters 1 to 3 of Larson and Gray, covering modern project management, how organizations select projects to fit strategy, and how structure and culture shape projects, along with three presentations, the syllabus checklist and introductions. Forum 1 asks for a thread of 300 to 500 words on the provided prompt that must demonstrate course-related knowledge, reference at least two peer-reviewed sources and include one biblical integration. Fifty points are available. In Module/Week 2, two classmates get replies of 250 to 350 words carrying the same source and integration requirements. Project management research journals are the most direct place to find the two required sources.
How this BUSI 313 Week 1 example is built
The thread answers the question with two causes, one deliberate and one psychological, and supports each with a peer-reviewed study. A sentence from the textbook frames why budgets matter at selection. The first study, on public works projects, shows how often and by how much costs were underestimated. The second, on the planning fallacy, explains why even honest planners err. The biblical integration uses a proverb about preparation and ties it to the practice of reference class forecasting, and the thread closes with two practical steps. The whole post fits under the 500-word ceiling with both sources and the verse in APA style. Studies get a brief mention apiece, keeping the argument in front.
BUSI 313 Week 1 grading rubric: where the points go
A strong overrun thread answers the prompt with chapter concepts, fits the 300-to-500-word band, cites two journal studies and weaves in Scripture. Larson and Gray and web articles do not count toward the pair of journal sources, and the Proverbs passage should change the argument, not ornament it. Clear, concise writing matters because classmates will reply in Module/Week 2. Threads that run long, lack a source or treat Scripture as an afterthought lose points. Because classmates must reply with their own sources, a thread that names specific studies gives them something concrete to build on, and that collaborative purpose is part of what the forum rewards.
BUSI 313 Week 1 help: mistakes that cost points
Answer the prompt in your first sentence and organize the thread around two or three reasons. Search the Jerry Falwell Library databases for peer-reviewed project management research, such as the Project Management Journal or the International Journal of Project Management. Describe each study's finding precisely. Choose a passage that speaks to planning or stewardship and explain how it applies. End with practical advice a project manager could use. Stay under 500 words, cite everything in APA format and leave a clear claim for classmates to discuss. Avoid stacking quotations; paraphrase each finding in your own words. If your prompt asks about a particular kind of project, choose research from that sector so the examples fit.
Related BUSI 313 sample papers
Other BUSI 313 weeks
- BUSI 313 Week 2: Integration of Faith 1
- BUSI 313 Week 3: Project Section 1
- BUSI 313 Week 4: Forum 2 Replies
- BUSI 313 Week 5: Integration of Faith 2
- BUSI 313 Week 6: Forum 3 Replies
- BUSI 313 Week 7: Project Section 2
- BUSI 313 Week 8: Forum 4 Replies
More BS in Business Administration sample papers
- BUSI 301 Week 1: Forum 1 Thread
- BUSI 303 Week 1: Forum 1 Thread
- BUSI 310 Week 2: Forum 1 Thread and Replies
- BUSI 320 Week 2: Discussion Board Forum 1
BUSI 313 Week 1 questions, answered
What is the BUSI 313 Forum 1 Thread?
The 50-point opening thread of BUSI 313, posted in Module/Week 1 at a length of 300 to 500 words, citing a pair of peer-reviewed studies and integrating Scripture once, answering the forum prompt.
Where can I find a free BUSI 313 Week 1 sample paper?
This page offers a complete BUSI 313 Week 1 forum thread on why projects run over budget, with research on cost overruns and the planning fallacy.
How often do large projects run over budget?
A study of 258 transportation infrastructure projects found costs underestimated in almost nine out of ten, with rail projects averaging overruns of about 45 percent.
What is the planning fallacy?
The tendency to underestimate how long one's own tasks will take, even when similar past tasks took longer than planned; experiments show people focus on plans rather than on past experience.
What else is due in BUSI 313 Module/Week 1?
Opening tasks are light in BUSI 313: the checklist, a hello to classmates, three presentations and Larson and Gray on how projects are chosen and organized.
Use it as a model, or ask for your own
This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.
Ask for a custom BUSI 313 Week 1 sample · All BUSI 313 weeks · All courses