MGMT 625 Week 4 Project Management Plan Example

Reviewed by Thomas Kerrigan, MBA, CPA · Liberty University · Updated

Here is a complete MGMT 625 Week 4 example of the Project Management Plan, which carries 200 points in Liberty University MGMT 625, the planning and scheduling course of the MS in Project Management, submitted in the module that assigns chapters 4 and 5 of Wilson. The guide lets students plan a construction, information technology, higher education, city government or healthcare project and requires eight to ten pages covering the description, scope, cost and objectives, team roles, stakeholders, assumptions and constraints, and plans for communication, risk and change. This sample plans a city government project: converting 14,200 high-pressure sodium streetlights to LED fixtures with networked controls over fourteen months for $9.8 million. Its tables set the scope boundary, budget, responsibility matrix, stakeholder register, communication schedule, top risks and change control thresholds that the Week 6 work breakdown structure later builds on.

CourseMGMT 625 Project Planning & Scheduling (MGMT625)
Module/Week4
AssignmentProject Management Plan
Paper typeProject management plan
Lengthabout 1,534 words, 6 double-spaced pages plus title page and references. Course guide: per the course guide, an 8-10-page Word plan for a construction, IT, higher education, city government or healthcare project, with a cover page and table of contents not counted, covering the project description; scope, cost and objectives; team roles and responsibilities; key stakeholders; assumptions and constraints; and communication, risk and change management plans
FormatAPA 7 student paper
Points200
SchoolLiberty University Online
ProgramMS in Project Management
Where it sitsModule/Week 4 in Liberty's published MGMT 625 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for MGMT 625 Week 4

1

Project Management Plan: Converting a City's 14,200 Streetlights to LED With Networked Controls

 

[Student Name]

School of Business, Liberty University

MGMT 625: Project Planning & Scheduling

Project Management Plan

[Instructor Name]

[Date]

 

The city, its departments, the contractor and every figure in the plan are composites standing in for the project a student plans; the PMBOK Guide, Wilson's text and the study cited are real; the requirements follow Liberty's public course guide for MGMT 625.

2

Project Management Plan: Converting a City's 14,200 Streetlights to LED With Networked Controls

Project Description

Why this part earns its pointsThe description states the purpose and the measurable outcome first, so every later section can be checked against them.
3

The city operates 14,200 streetlights, most of them high-pressure sodium fixtures installed between 1985 and 2005. They consume about 9.6 million kilowatt-hours a year, cost about $1.15 million annually in electricity and maintenance, and fail at a rate that generates roughly 2,300 repair calls a year, most reported by residents. This project will replace every cobrahead fixture with a light-emitting diode fixture and install a networked control node on each pole, connected to a central management system. The new system will let the Public Works Department dim lights during low-traffic hours, receive automatic alerts when a light fails and measure energy use pole by pole. The city council approved the project in its capital budget with the expectation that energy savings will repay its cost within eleven years.

The project runs fourteen months, from contract award in February to final acceptance the following March. Installation will be done by a contractor selected through competitive bidding, working under the direction of the city's Public Works Department, with the city's Information Technology Department responsible for integrating the control system with existing networks. The project is sponsored by the Director of Public Works and managed by a project manager in the department's engineering division.

Project Scope, Cost and Objectives

The scope includes the purchase and installation of 14,200 LED cobrahead fixtures, a control node on every fixture, the central management software and its hosting, the integration of failure alerts with the city's work order system, the disposal and recycling of removed fixtures, and training for public works staff. It also includes a photometric survey of 40 sample streets before and after installation to confirm that lighting meets the city's standards.

The scope excludes the replacement of poles, arms or underground wiring except where a pole is found unsafe during installation, which will be handled as a change; the 640 decorative lights in the downtown district, which are scheduled for a separate project; traffic signals; and lights owned by the electric utility on state highways.

Cost elementEstimate
LED fixtures (14,200)$4,260,000
Control nodes and gateways$1,850,000
Installation labor and equipment$2,140,000
Central management software (five years)$420,000
Photometric survey and engineering$180,000
City project management and inspection$310,000
Contingency$640,000
Total$9,800,000

The estimate was built from manufacturer quotes for fixtures and nodes, a unit installation cost per pole from three recent bids in comparable cities, and staff time for city management. The contingency, about 7 percent, reflects the record of similar conversions rather than the planners' own expectations, an approach Flyvbjerg (2006) recommends to correct for optimism by forecasting from a reference class of comparable projects.

The schedule is built in four phases. Mobilization and design, in months one and two, complete the specifications, the security review of the control system, the pole ownership survey and a pilot on two residential streets. Installation, in months three through twelve, proceeds district by district across the city's eight maintenance districts, starting with the two the police department identified as priorities and pausing for the coldest weeks of winter. Integration and testing, overlapping installation from month five, connects each district's control nodes to the central system as the district is finished. Closeout, in months thirteen and fourteen, completes the photometric survey, staff training, punch-list repairs and final acceptance. Each district completion is a milestone reported to the sponsor.

The project has four objectives. First, complete installation and acceptance of all 14,200 fixtures by March 31 of next year. Second, stay within the $9.8 million budget. Third, reduce streetlight energy use by at least 55 percent, measured over the first full year of operation. Fourth, cut resident-reported outages by at least 80 percent through automatic failure alerts.

Team Roles and Responsibilities

Why this part earns its pointsA responsibility matrix gives every major deliverable a single accountable owner, which a paragraph of job titles would not.
4

The project manager plans and controls the work, maintains the schedule and budget, chairs weekly progress meetings and reports to the sponsor. The sponsor, the Director of Public Works, approves changes within the department's authority and resolves issues the project manager cannot. The city's lighting engineer approves fixture specifications and photometric results. The IT project lead manages the control system's integration and security review. The contractor's superintendent directs installation crews. Two city inspectors verify installation quality, and the purchasing manager administers the contract.

DeliverableProject managerSponsorLighting engineerIT leadContractorInspectors
Fixture and node specificationsAIRCCI
Installation by districtAICIRC
Control system integrationAICRCI
Photometric surveyAIRICC
Staff trainingRACCCI
Final acceptanceRACCCC

R = responsible, A = accountable, C = consulted, I = informed.

Key Stakeholders

The project affects many groups whose support or concern can change its schedule. The city council approved the funding and expects quarterly reports on cost and savings. Residents will see crews in their neighborhoods and will notice the change from yellow to white light; some neighborhoods have raised concerns in other cities about glare and brightness. The police department values improved lighting and has asked for priority in high-crime districts. The electric utility must update its billing as fixtures change and owns some poles on which city lights are mounted. Public works crews will maintain the new system and must be trained. Neighborhood associations and the downtown business district want advance notice of work on their streets.

StakeholderMain interestInfluenceEngagement approach
City councilCost, savings, resident satisfactionHighQuarterly briefing and dashboard
ResidentsLight quality, disruptionMediumDoor hangers, website map, hotline
Police departmentSafety in priority areasMediumDistrict sequencing input
Electric utilityBilling, shared polesHighMonthly coordination meeting
Public works crewsMaintainability, trainingMediumTraining and pilot participation
Neighborhood associationsNotice, light colorMediumPre-installation meetings

Assumptions and Constraints

The plan assumes that fixture and node deliveries will arrive in monthly lots matching the installation schedule, that the contractor can staff four installation crews, that the utility will provide pole ownership data by the end of the first month, and that the existing city network can carry the control system's traffic with the planned gateways. It also assumes that residents' concerns about light color can be addressed with 3000 kelvin fixtures, which several cities have adopted for this reason.

Four constraints bind the plan: the council's fixed appropriation, by a noise ordinance that limits work in residential areas to 7 a.m. to 7 p.m., by the city's purchasing rules, which require council approval for any contract change above $100,000, and by the cybersecurity requirements of the city's IT policy, which the control system must pass before it connects to the network. Winter weather is expected to slow installation in December and January, and the schedule reflects that.

Communication Management Plan

Communication is planned around who needs what information, how often and in what form. The project manager holds a weekly progress meeting with the contractor, inspectors and IT lead, reviewing installations completed, defects found and the coming week's districts. Every second Friday the sponsor gets a written status report, covering schedule, budget, risks and decisions needed. The city council receives a quarterly briefing with a one-page dashboard showing fixtures installed, spending against budget and early energy results. Residents receive door hangers two days before crews arrive on their street, and a map on the city website shows completed and upcoming districts. A hotline and email address route resident questions to the project team, with a target of a response within two business days. Wilson (2014) emphasizes that schedule and cost data matter only when they reach decision makers early enough to act on, and this plan ties each report to a decision maker. Internally, the project uses one shared schedule file and one issues log, so that the contractor, inspectors and IT team work from the same information. Communication with residents is coordinated with the city's communications office, which approves notices, handles media inquiries and posts updates on the city's social media accounts. If a district falls more than two weeks behind its milestone, the project manager notifies the sponsor and the affected council members within one week, before residents begin calling.

Risk Management Plan

Why this part earns its pointsThe risk plan is limited to the risks that matter most, each with a response and an owner, rather than a generic list.
5

Risks will be identified at the kickoff workshop and at each weekly meeting, scored for probability and impact on five-point scales, and recorded in a register maintained by the project manager, as the PMBOK Guide's risk chapter describes (Project Management Institute, 2017). The six highest risks at the start of the project are listed below.

RiskResponseOwner
Fixture or node deliveries arrive lateMitigate: staged deliveries in the contract with penalties; second approved supplierPurchasing manager
Control system fails the city's security reviewMitigate: begin review in month one with vendor documentation; pilot on an isolated networkIT lead
Residents object to light color or glareMitigate: 3000 kelvin fixtures; pilot street and public meeting before full rolloutProject manager
Unsafe poles discovered during installationAccept: allowance in contingency; inspectors flag poles for separate replacementLighting engineer
Contractor cannot staff four crewsMitigate: crew count in the contract; monthly production reviewProject manager
Utility pole ownership data incompleteMitigate: joint field survey in month oneProject manager

Quality is managed alongside risk. City inspectors check one in every ten installations in the field for fixture orientation, node connection and pole condition, and the central system confirms that every node reports in before a district is accepted. Defects found by inspectors are logged and must be corrected before the contractor's monthly payment for that district is released.

The register will be reviewed weekly, and any risk whose score rises above the high threshold will be reported to the sponsor within two business days.

Change Management Plan

Anyone who wants to alter what the project delivers, when it finishes or what it costs submits a change request form, which names the proposed change, gives its reason and estimates its effect on cost, completion date and each of the four objectives. The project manager will assess each request within five business days with input from the affected team members. Approval depends on the change's effect. The project manager may approve changes that cost less than $25,000 and do not move the completion date. The sponsor may approve changes up to $100,000 or a two-week schedule effect. Changes above $100,000 require city council approval under the purchasing rules. Approved changes will be recorded in a change log, reflected in the schedule and budget baselines, and reported in the next status report. The contingency may be drawn only for approved changes or realized risks, and every draw will be recorded against the change or risk that caused it.

Conclusion

This plan defines what the streetlight conversion will deliver, what it will cost, who is responsible for each part and how the team will communicate, manage risks and control changes. Its scope boundaries, budget and responsibility matrix will form the basis for the work breakdown structure and the detailed schedule, and its objectives will be used to judge the project's success after a year of operation.

6

References

Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5-15. https://doi.org/10.1177/875697280603700302

Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.).

Wilson, R. (2014). A comprehensive guide to project management schedule and cost control. Pearson FT Press.

What the MGMT 625 Week 4 instructions ask

MGMT 625 collects the Project Management Plan in Module/Week 4, with chapters 4 and 5 of Wilson, two presentations and the Forum 2 replies, and at 200 points it outweighs every other assignment in the course. The guide asks students to use Microsoft Word to plan a project in one of five areas, construction, information technology, higher education, city government or healthcare. The plan must contain a project description; the project's scope, cost and objectives; team roles and responsibilities; key stakeholders; assumptions and constraints; and three subsidiary plans for communication management, risk management and change management. It must run eight to ten pages, and a cover page and table of contents are required but are not counted. The Work Breakdown Structure due in Module/Week 6 is built for this same project.

How this MGMT 625 Week 4 example is built

The plan begins with the city's purpose: cutting streetlight energy use by more than half and gaining remote control of every light. The scope section separates what is included, fixture replacement, a control node on every pole and a central management system, from what is not, such as pole replacement and decorative downtown lights. A cost table breaks the $9.8 million budget into fixtures, controls, labor, software, project management and a contingency sized with reference to comparable city conversions. A responsibility matrix assigns roles, a stakeholder register maps interests, and a list of assumptions and constraints follows. The communication plan schedules reports and neighborhood notices, the risk plan lists six top risks with responses, and the change plan sets approval thresholds by cost and schedule effect.

MGMT 625 Week 4 grading rubric: where the points go

The plan is graded on completeness and on whether its parts fit together as a plan someone could manage from. Every element the guide names must be present: description, scope, cost, objectives, roles, stakeholders, assumptions and constraints, and the communication, risk and change management plans. Strong plans make objectives measurable, draw a clear line around scope, show how the budget was built, and assign responsibilities so that every major deliverable has an owner. The subsidiary plans should be specific to the project, with real audiences, risks and approval levels. Consistent use of PMBOK Guide terms and Wilson's planning concepts, clear tables, a cover page and table of contents, and a length of eight to ten pages complete the evaluation.

MGMT 625 Week 4 help: mistakes that cost points

Weak MGMT 625 plans explain project management in general instead of planning one project. Choose a project you understand, give it real numbers, and make every section about it. Write scope as both an in list and an out list, because the out list prevents the disputes that slow schedules later. Show how the budget was estimated, not just its total. Use a responsibility matrix rather than a paragraph for roles. Keep the risk plan to the risks that matter most, with owners and responses, and give the change plan thresholds so readers know who approves what. Plan the project now with the Week 6 WBS in mind, since the same scope must break down cleanly into work packages.

Related MGMT 625 sample papers

Other MGMT 625 weeks

More MS in Project Management sample papers

MGMT 625 Week 4 questions, answered

What is the MGMT 625 Project Management Plan?

Worth 200 points and submitted in the fourth module, it is an eight-to-ten-page Word plan for a construction, IT, higher education, city government or healthcare project with communication, risk and change plans.

Where can I find a free MGMT 625 Week 4 sample paper?

This page shows a complete MGMT 625 Week 4 project management plan for converting a city's 14,200 streetlights to LED fixtures with networked controls.

What sections does the MGMT 625 plan require?

Project description; scope, cost and objectives; team roles and responsibilities; key stakeholders; assumptions and constraints; a communication management plan; a risk management plan; and a change management plan.

Do the cover page and table of contents count toward the MGMT 625 page limit?

No; the guide requires both a cover page and a table of contents but leaves them out of the eight-to-ten-page count, which measures the body of the plan alone.

What is a responsibility assignment matrix?

A grid with deliverables down one side and roles across the top, each cell coded to show who does the work, who answers for it, who is asked and who is told.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.