| Course | MGMT 620 Project Evaluation & Assessment (MGMT620) |
|---|---|
| Module/Week | 5 |
| Assignment | DB Forum 3 |
| Paper type | Discussion thread and replies |
| Length | about 997 words (thread and replies). Course guide: per the course guide, a 500-750-word thread with at least three peer-reviewed sources, one biblical integration and one text citation, plus replies to at least two classmates of 200-250 words each, each with a peer-reviewed source or a biblical integration in addition to a text |
| Format | APA 7 citations and reference list |
| Points | 100 |
| School | Liberty University Online |
| Program | MS in Project Management |
| Where it sits | Module/Week 5 in Liberty's published MGMT 620 course guide; current sections can differ |
| Updated | October 2026 |
Free sample paper for MGMT 620 Week 5
Discussion Board Forum 3: Thread and Two Replies
MGMT 620 Project Evaluation & Assessment, Discussion Board Forum 3 (thread and two replies)
Thread by [Student Name]
The prompt, the school district's rollout and the classmates' posts are composites standing in for the course's own forum; Thomas's text, the peer-reviewed studies and Scripture are real; the requirements follow Liberty's public course guide for MGMT 620.
Thread
Our school district issued laptops to all 9,400 of its students in two phases: the four middle schools in one fall and the three high schools the next. Phase one went badly in three ways. Families enrolled in the device insurance program late because the enrollment form went home only in English, so more than 300 damaged laptops were repaired at full cost. Classrooms had too few charging carts, so teachers lost the first ten minutes of many periods. And the help desk, staffed by the same technicians who supported teachers, had no process for students, who lined up at the library before school. The district held its review of phase one in May, eight months after the rollout, with half of the original team reassigned. The review listed all three problems. In phase two, all three happened again: the insurance form went home in English only, the high schools ordered carts using the middle schools' ratio although high school classes are larger, and the help desk again opened only during staff hours. The phase two project manager, who joined after phase one, told me she had never seen the May review's notes, which sat in a shared folder she did not know existed.
Von Zedtwitz (2002), surveying research and development organizations, found that only about one in five projects received a post-project review, and based on interviews with managers he grouped the barriers to learning into four classes, including the lack of time and attention after a project ends and the limited personal interest and ability of those involved. Our review happened, but late, and its timing reflected exactly those barriers: once the laptops were out, everyone moved on to the next school year's work. Busby (1999), assessing post-project reviews in detail, found that they spread knowledge and correct misunderstandings, but that their diagnosis tended to be shallow and their remedies superficial. Our May review named the problems but proposed remedies such as "improve communication with families," which no one owned and no one could check.
Williams (2008), reviewing the literature on learning from projects and surveying project managers, concluded that the temporary nature of project organizations and the complexity of projects both inhibit learning, and that organizations must deliberately build the structures that let lessons move from one project to the next. On the practice side, Thomas (2015) treats lessons learned as an evaluation process with defined steps, from identifying lessons to disseminating and applying them, rather than a single meeting. For a multiphase project like ours, that means a brief review the week each phase closes, while the team is still together, with each lesson assigned an owner and a deadline before the next phase begins. Had the insurance form been translated by a named person by June, phase two's families would have enrolled on time.
Paul told the Corinthians that the events of Israel's wilderness years happened as examples and were written down for the instruction of later generations (English Standard Version Bible, 2001/2016, 1 Corinthians 10:11). Scripture assumes that a recorded failure is useful only to someone who reads it before repeating it. Our district now schedules phase reviews in its project calendar, and every lesson leaves the meeting with a name beside it.
Classmates: has a lesson from one of your projects actually changed how the next project was run, and what made it stick?
Reply to Priscilla
Priscilla, your thread about your hospital's move to blame-free post-project reviews was encouraging. You described how staff began speaking openly once the rule was clear that reviews would examine processes, not people, and how the number of issues raised doubled.
Busby (1999) found that reviews are good at spreading knowledge but tend toward shallow diagnosis and overly specific explanations. A blame-free format helps with the first problem, because people share more, but it may not solve the second. A review can surface twice as many issues and still stop at the first explanation for each. One technique is to ask "why" several times for each major issue until the discussion reaches a cause the organization can change. Thomas (2015) also emphasizes that lessons must be applied, which means each one needs an owner.
James likens someone who listens to the word without acting on it to a man who studies his face in a mirror, walks away and at once forgets how he looked (English Standard Version Bible, 2001/2016, James 1:22-24). Assigning each lesson to a person with a due date would also give the next review something to check, which turns the review from a conversation into a cycle. Do your reviews end with owners assigned to the lessons, and has anyone checked whether the issues raised in the first reviews have recurred?
Reply to Victor
Victor, your engineering firm's practice of holding a lessons-learned review three months after every project closes was a thoughtful design, and I appreciated your reasoning that the team needs distance to be objective.
Von Zedtwitz (2002) suggests a cost to waiting, though. His interviews found that time and attention drain away after a project ends and that people's interest in reviewing fades as new work arrives. Three months later, the details that make a lesson usable, who decided what and why, may already be fuzzy, and some team members will have left. Williams (2008) adds that the temporary nature of project teams is one of the main barriers to learning, which a delay deepens.
Thomas (2015) describes lessons learned as a process that can run throughout a project, not just at its end. A compromise might be a short review within two weeks of closeout, while memories are fresh, followed by your three-month review to assess outcomes. The first would capture what happened; the second would test whether it mattered. The two-week session could be short, an hour with a structured list of questions, so it would not compete with the team's next assignments. How many of your original team members typically attend the three-month review, and has attendance changed over time?
References
Busby, J. (1999). An assessment of post-project reviews. Project Management Journal, 30(3), 23-29. https://doi.org/10.1177/875697289903000304
English Standard Version Bible. (2016). Crossway. (Original work published 2001)
Thomas, W. H. (2015). The basics of project evaluation and lessons learned (2nd ed.). CRC Press.
von Zedtwitz, M. (2002). Organizational learning through post-project reviews in R&D. R&D Management, 32(3), 255-268. https://doi.org/10.1111/1467-9310.00258
Williams, T. (2008). How do organizations learn lessons from projects, and do they? IEEE Transactions on Engineering Management, 55(2), 248-266. https://doi.org/10.1109/TEM.2007.912920
What the MGMT 620 Week 5 instructions ask
Module/Week 5 of MGMT 620 grades a single piece of work: Forum 3, the course's final forum, carries 100 points and is read with the last of the custom text's selected readings and a presentation. Its thread keeps to the band of 500 to 750 words and needs course-related knowledge, a citation of a course text, a biblical integration and three or more peer-reviewed sources. Each reply, to at least two classmates, keeps to 200 to 250 words and carries a refereed source or Scripture alongside a text citation. Lessons learned are the theme of the course's second half: Thomas's chapters follow in Modules/Weeks 6 to 8, and the Lessons Learned Training Project closes the course, so a thread that diagnoses why reviews fail prepares directly for that project.
How this MGMT 620 Week 5 example is built
The thread opens with the district's two phases: middle schools in the fall, high schools the next fall, and a review of phase one held in May, eight months after it ended, with half its team already reassigned. It then shows three problems that recurred in phase two, late insurance enrollment, a charging cart shortage and a help desk built for adults. Von Zedtwitz's finding that only one in five projects in his survey received a review, and his four classes of learning barriers, explain the delay. Busby's observation that reviews tend toward shallow diagnosis explains why the May review's remedies never took hold. Williams supports a recommendation to review at each phase end. Paul's statement that Israel's failures were written down as examples closes the thread.
MGMT 620 Week 5 grading rubric: where the points go
Graders read Forum 3 for understanding of how organizations learn from projects and for critical interaction. A strong thread shows a concrete failure to learn, explains it with research rather than blaming individuals, and recommends practices that address the specific barriers found. Each source should carry part of the argument, and the course text should inform the recommendation. On the thread, the guide's word range, three refereed articles, text citation and Scripture all count, and the replies are held to their band and their source rule. Replies that question a classmate's lessons-learned practice, for instance by asking whether lessons changed anything in the next project, show the critical engagement the instructor wants. Accurate research reporting and APA citations finish the work.
MGMT 620 Week 5 help: mistakes that cost points
Too many Forum 3 threads praise lessons learned in principle and stop. Show instead a case where a lesson was documented and then repeated, and ask why. Research identifies several barriers, from lack of time to the temporary nature of project teams, so name the ones at work in your case. Distinguish between holding a review and acting on it; many organizations do the first and not the second. Recommend changes that follow from the barriers, such as timing reviews at phase ends or assigning an owner to each lesson. Hold each reply to 200 to 250 words, and have each one ask how the classmate's organization checks whether a lesson changed practice on the next project.
Related MGMT 620 sample papers
Other MGMT 620 weeks
- MGMT 620 Week 2: Forum 1: Defining Project Success
- MGMT 620 Week 4: Forum 2: Measuring Benefits
- MGMT 620 Week 6: Project Evaluation Research Paper
- MGMT 620 Week 8: Lessons Learned Training Project
More MS in Project Management sample papers
MGMT 620 Week 5 questions, answered
What is MGMT 620 DB Forum 3?
MGMT 620's last forum, again worth 100 points and set in the fifth module, with a 500-750-word thread and replies to at least two classmates under the course's source and Scripture rules.
Where can I find a free MGMT 620 Week 5 sample paper?
This MGMT 620 Week 5 sample is a complete forum on why a school district repeated its mistakes in a two-phase laptop rollout, with replies to two classmates.
Why do organizations fail to learn from projects?
Research points to lack of time and attention after delivery, teams that disband before reviewing, shallow diagnosis in reviews that do happen, and lessons recorded without an owner to act on them.
When should a post-project review be held?
Soon after the work it covers, while the team is still together, and at the end of each phase in multiphase projects, so lessons reach the next phase rather than only the next project.
What comes after Forum 3 in MGMT 620?
The 200-point Project Evaluation Research paper in Module/Week 6, Quiz 2 in Module/Week 7, and the Lessons Learned Training Project and Quiz 3 in the final module.
Use it as a model, or ask for your own
This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.