ACCT 521 Week 6 Individual PowerPoint Example

Reviewed by Thomas Kerrigan, MBA, CPA · Liberty University · Updated

This ACCT 521 Week 6 sample Individual PowerPoint shows how a student can connect the course's budgeting chapters to a workplace, here a composite injection-molding plant where the presenter works as a cost accountant. Across eleven slides with full speaker notes, it shows the plant's old static overhead budget, explains why its monthly variances blamed supervisors for volume they did not control, rebuilds the budget as a flexible one with a separate fixed and variable portion, and reports what changed in the first quarter. Two slides draw on 2024 and 2025 journal research on sticky costs and on cost allocation to explain why the plant also changed how it charges maintenance. Liberty University ACCT 521 requires this 100-point MS in Accounting presentation in its sixth module/week, with every source under three years old.

CourseACCT 521 Advanced Cost Accounting (ACCT521)
Module/Week6
AssignmentIndividual PowerPoint
Paper typePresentation with speaker notes
Lengthabout 934 words, 3 double-spaced pages plus title page and references. Course guide: a PowerPoint of 10-12 slides, about 12 minutes, showing how a course topic connects to the student's workplace, with actual samples from the job site, a narrative in the speaker notes and sources less than 3 years old
FormatAPA 7 student paper
Points100
SchoolLiberty University Online
ProgramMS in Accounting
Where it sitsModule/Week 6 in Liberty's published ACCT 521 course guide; current sections can differ
UpdatedOctober 2026

Free sample paper for ACCT 521 Week 6

1

From Static to Flexible: How Our Plant Budgets Overhead, Why the Variances Misled Us and What We Changed

 

[Student Name]

School of Business, Liberty University

ACCT 521: Advanced Cost Accounting

Individual PowerPoint

[Instructor Name]

[Date]

 

The plant, its figures and its reports are a composite standing in for the student's own workplace; all research cited was published within the last three years.

Why this part earns its pointsThe opening slide establishes the workplace and the presenter's role, which the assignment requires.
2

From Static to Flexible: How Our Plant Budgets Overhead, Why the Variances Misled Us and What We Changed

Slide 1: Budgeting Overhead at Our Molding Plant

  • 42 injection-molding presses, two shifts
  • Overhead budget of $9.6 million a year
  • My role: cost accountant, monthly overhead reports

Speaker notes: Good afternoon. I work as a cost accountant at a plastics molding plant that makes housings and components for appliance manufacturers. One of my monthly tasks is preparing the overhead report each production supervisor receives. This presentation shows how a topic from our budgeting chapters, the flexible budget, solved a real problem in that report. The figures in this presentation are scaled from the plant's actual numbers, with permission from my manager.

Slide 2: The Report We Used to Send

  • Sample: March overhead report, static budget
  • Budget set for 21,000 press hours
  • Actual: 17,600 hours, $746,000 spent vs. $800,000 budget
  • Variance reported: $54,000 favorable

Speaker notes: This is an excerpt of the March report from last year. The budget was set once a year for planned press hours, and each month we compared actual overhead with that fixed number. In March, a customer delayed a program, hours fell 16% below plan, and the report showed a $54,000 favorable variance. The supervisors were congratulated. That turned out to be the wrong message.

Why this part earns its pointsThe diagnosis slide explains the conceptual flaw using the chapter's distinction between volume and spending.
3

Slide 3: Why the Report Misled Us

  • Static budget ignores the change in volume
  • Lower hours should mean lower variable overhead
  • The "savings" came from producing less, not spending better

Speaker notes: Our textbook explains that a static budget is built for one level of activity. When actual activity differs, comparing actual costs with that budget mixes two different things: the effect of volume and the effect of spending. Because we ran 3,400 fewer hours, we should have spent much less on power, supplies and indirect labor. A favorable variance was almost guaranteed, whatever the supervisors did.

Slide 4: Splitting Fixed and Variable Overhead

  • Fixed overhead: $380,000 a month
  • Variable overhead: $20 per press hour
  • Estimated from 24 months of data

Speaker notes: To build a flexible budget, I first separated fixed and variable overhead. Using two years of monthly data, a regression of overhead on press hours gave a fixed component of about $380,000 a month, mostly depreciation, supervision and building costs, and a variable rate of about $20 per press hour for power, resin handling and maintenance supplies.

Slide 5: The Flexible Budget for March

  • Flexible budget at 17,600 hours: $380,000 + $352,000 = $732,000
  • Actual: $746,000
  • Spending variance: $14,000 unfavorable

Speaker notes: At the hours we actually ran, the budget should have been $732,000, not $800,000. Against that figure, actual spending of $746,000 was $14,000 over budget. The same month that looked like a $54,000 success was really a $14,000 overrun once volume was taken out. Most of the overrun came from maintenance, which the next slides explain.

Why this part earns its pointsResearch enters where it explains a pattern the plant saw, which keeps the presentation practical.
4

Slide 6: Costs That Don't Come Down

  • Maintenance labor stayed flat as hours fell
  • Classic "sticky" cost behavior
  • Research: creditors and governance can reduce stickiness

Speaker notes: When hours fell, maintenance labor did not. Hospitals face the same choice between fixed and flexible labor, and Pizzini and Vansant (2024) found that those with more purchasing power choose more flexible cost structures. Technicians were kept on full shifts. Accounting research calls this cost stickiness, when costs rise with activity faster than they fall. Zhou (2024) found that stickiness declined sharply when creditors gained control rights after covenant violations, which suggests that outside scrutiny pushes managers to cut idle resources. For us, the flexible budget itself became that scrutiny, because it made idle capacity visible every month.

Slide 7: How We Charge Maintenance Now

  • Old method: maintenance charged by press hours
  • New method: separate charge for planned and emergency work
  • Goal: reward cooperation on preventive maintenance

Speaker notes: We also changed how maintenance is charged to the two shifts. Brown et al. (2025) found in experiments that allocation methods that link managers' charges to one another, called noninsulating allocations, increased cooperation, but also risk-taking. We chose a middle path: planned maintenance is shared on hours, while emergency repairs are charged to the shift where the breakdown occurred, so supervisors share the benefit of prevention but still own their emergencies.

Slide 8: The New Monthly Report

  • Sample: April report, flexible budget format
  • Columns: actual, flexible budget, static budget
  • Two variances: volume and spending

Speaker notes: This is the April report in the new format. Each supervisor now sees actual cost, the flexible budget at actual hours and the original static budget. The gap between the original budget and the flexible one is the volume effect, which belongs to sales and scheduling. The difference between actual and flexible is the spending effect, which belongs to the supervisor.

Slide 9: First-Quarter Results

  • Spending variances fell from $14,000 to $3,500 by June
  • Maintenance overtime down 22%
  • Supervisors now ask for weekly flexible figures

Speaker notes: By June, the monthly spending variance had fallen to about $3,500 unfavorable, and maintenance overtime dropped by about a fifth as supervisors adjusted staffing to scheduled hours. The most encouraging sign is that supervisors asked for weekly flexible budget figures, which tells me they find the information useful rather than threatening.

Slide 10: Lessons for Our Plant

  • Measure managers against what they control
  • Revisit fixed and variable estimates every year
  • Allocation methods shape behavior

Speaker notes: Three lessons stand out. First, a budget report should hold managers responsible only for what they control. Second, our fixed and variable estimates are only estimates and need refreshing, because our product mix changes. Third, the way we allocate shared costs is a control choice with behavioral effects, as the research on Slide 7 suggests.

Slide 11: Next Steps and References

  • Extend flexible budgets to quality control and shipping
  • Re-estimate cost behavior in January
  • References: Brown et al. (2025); Pizzini and Vansant (2024); Zhou (2024)

Speaker notes: Next, we plan to extend the flexible format to quality control and shipping, and I will re-estimate the fixed and variable split each January. Thank you for your time. I would be glad to take questions about the report or the regression behind it.

5

References

Brown, J. L., Sprinkle, G. B., & Way, D. (2025). The effects of insulating and noninsulating cost allocations on cooperation and risk-taking. Journal of Management Accounting Research, 37(2), 21-45. https://doi.org/10.2308/jmar-2023-098

Pizzini, M., & Vansant, B. (2024). Monopsony power and cost structure: Evidence from the U.S. hospital industry. Journal of Management Accounting Research, 36(2), 157-177. https://doi.org/10.2308/jmar-2022-078

Zhou, J. (2024). Creditors' role in shaping asymmetric cost behavior: Evidence from debt covenant violation. Journal of Management Accounting Research, 36(2), 179-202. https://doi.org/10.2308/jmar-2023-014

What the ACCT 521 Week 6 instructions ask

The Individual PowerPoint is due in ACCT 521 Module/Week 6, which covers chapters 12 and 13 of Lanen et al. on budgeting, with Connect Plus Homework 6 and the second peer evaluation. The student creates a presentation of about twelve minutes and ten to twelve slides showing how a topic covered in the course connects to his or her workplace. The slides should incorporate actual samples from the job site, explained through the presentation notes feature, and every source must be properly cited in current APA style and be less than three years old. Students without a current job may use a recent or volunteer workplace. The presentation is individual work, unlike the group faith project the following week.

How this ACCT 521 Week 6 example is built

The sample presentation follows a problem-and-solution arc that suits a workplace audience. It opens with the plant and the presenter's role, shows an excerpt of the static budget report the plant used, and diagnoses why the variances misled managers. The middle slides rebuild the report as a flexible budget, separating fixed and variable overhead and splitting the total variance into a volume effect and a spending effect. Two slides bring in recent research on sticky costs and allocation methods. The final slides show first-quarter results, lessons learned and next steps. Speaker notes carry the explanation, as the assignment requires. Workplace figures are scaled and labeled, and permission to use them is noted on the first slide.

ACCT 521 Week 6 grading rubric: where the points go

Instructors grade the ACCT 521 Individual PowerPoint on a clear connection between a course topic and the student's actual workplace, on the use of real samples from the job site, on accurate application of the course concepts, on speaker notes that explain each slide as a narrative, and on the ten-to-twelve-slide, twelve-minute scope. Sources must be current, less than three years old, and cited in APA style on the slides or in a reference slide. Presentations that use generic textbook examples instead of workplace material, or that put the whole explanation on crowded slides without notes, lose points. A clear story, problem first and result last, helps the audience follow twelve minutes of material.

ACCT 521 Week 6 help: mistakes that cost points

Pick one course topic you can see at work, such as budgeting, variance analysis, costing or allocation, and build the presentation around a single problem it solved or could solve. Use real samples, with confidential numbers changed or scaled and labeled as such, and get your employer's permission before sharing anything internal. Let each slide carry three or four brief points, and save the explaining for the notes. Show one before-and-after comparison, since it makes the course concept concrete. Check that every source is less than three years old; the textbook edition may not qualify. Rehearse once to stay near twelve minutes. Time the notes aloud, since reading speed sets the length.

Related ACCT 521 sample papers

Other ACCT 521 weeks

More MS in Accounting sample papers

ACCT 521 Week 6 questions, answered

What is the ACCT 521 Individual PowerPoint?

A 100-point presentation due in Module/Week 6, ten to twelve slides with speaker notes, showing how a topic from the course connects to the student's own workplace using samples from the job.

Where can I find a free ACCT 521 Week 6 sample paper?

This page shows an entire ACCT 521 Week 6 PowerPoint sample with eleven slides and notes, converting a plant's static overhead budget into a flexible budget.

What is the difference between a static and a flexible budget?

A static budget is set for one planned level of activity, while a flexible budget restates costs for the activity actually achieved, separating volume effects from spending effects.

Why do static budget variances mislead managers?

When actual volume differs from plan, static variances mix the effect of volume with the effect of spending, so managers may be blamed or credited for activity they did not control.

What else is due in ACCT 521 Module/Week 6?

Students also submit Connect Plus Homework 6 and their second peer evaluation that week, along with chapters 12 and 13 of Lanen et al. and a presentation.

Use it as a model, or ask for your own

This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.