| Course | BUSI 680 Advanced Project Management I (BUSI680) |
|---|---|
| Module/Week | 5 |
| Assignment | Group DB Forum 3 Thread |
| Paper type | Discussion thread |
| Length | about 527 words (thread and replies). Course guide: an individual thread of 500 to 750 words demonstrating course-related knowledge, referencing at least 3 peer-reviewed sources and including at least 1 biblical integration; a collaborative group reply follows in Module/Week 6 |
| Format | APA 7 citations and reference list |
| Points | 50 |
| School | Liberty University Online |
| Program | MBA |
| Where it sits | Module/Week 5 in Liberty's published BUSI 680 course guide; current sections can differ |
| Updated | October 2026 |
Free sample paper for BUSI 680 Week 5
Group Discussion Board Forum 3: Thread
BUSI 680 Advanced Project Management I, Group Discussion Board Forum 3: Thread
Thread by [Student Name]
The forum prompt and the water utility are composites standing in for the course's own; the textbook, Scripture and research cited are real, and the requirements follow Liberty's public course guide for BUSI 680.
Thread
Two years of design records at the composite water utility I work for showed a pattern I could not ignore. Tasks estimated by the engineers who would perform them, such as preparing a hydraulic model or completing a set of bid drawings, took on average 30 to 40 percent longer than estimated. Almost none finished early. The engineers are experienced and conscientious, and many of them made similar estimates on similar tasks the year before. Something systematic is happening.
Larson and Gray (2018) recommend that the people most familiar with the work estimate it, and that estimates draw on historical data. Our engineers follow the first guideline but rarely the second, and research explains why that matters. Buehler et al. (1994) asked people to predict how long they would take to complete academic and personal tasks and found that predictions were consistently too optimistic. Think-aloud procedures showed that people focused on plans for the task rather than on relevant past experiences, and they tended to attribute their past delays to external, one-time causes. In one study, simply telling participants to tie their forecast to how similar jobs had gone before removed the optimism altogether. An engineer who remembers last year's late drawings as bad luck will plan this year's drawings as if luck will improve.
Organizations can magnify the same tendency. Kahneman and Lovallo (1993) explained that decision makers tend to consider each problem as unique, so they reason from the particulars of the plan in hand and overlook the record of comparable efforts, and the result is forecasts bolder than history would support. A project schedule built task by task from engineers' inside-view estimates inherits that optimism at every step, and nothing in the process corrects it.
The pattern is not unique to our utility. Halkjelsvik and Jørgensen (2012) reviewed studies of judgment-based predictions of performance time across psychology, engineering and management. They found that underestimation was reported more often than overestimation in engineering and management studies, though not in psychology studies, and they questioned some common beliefs about the effects of task complexity and experience. That nuance matters: experience alone did not guarantee better estimates, which fits our experienced engineers' results.
Scripture counsels humility about the future. James rebuked those who announced that they would go to a certain town, spend a year there and make a profit, reminding them that they did not know what tomorrow would bring and that they should instead say they would do this or that if the Lord wills (English Standard Version Bible, 2001/2016, James 4:13-15). The passage does not forbid planning; it forbids treating plans as certainties. Estimates that ignore past experience do exactly that.
I would propose three changes. First, maintain a simple database of planned and actual durations for recurring design tasks and show it to engineers when they estimate. Second, ask for three-point estimates, optimistic, most likely and pessimistic, rather than a single number. Third, review estimates at the end of each design phase and update the schedule, consistent with the chapter's advice on phase estimating. I would like to know whether others in our group have tried historical databases, and whether engineers accepted them.
References
Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366-381. https://doi.org/10.1037/0022-3514.67.3.366
English Standard Version Bible. (2016). Crossway. (Original work published 2001)
Halkjelsvik, T., & Jørgensen, M. (2012). From origami to software development: A review of studies on judgment-based predictions of performance time. Psychological Bulletin, 138(2), 238-271. https://doi.org/10.1037/a0025996
Kahneman, D., & Lovallo, D. (1993). Timid choices and bold forecasts: A cognitive perspective on risk taking. Management Science, 39(1), 17-31. https://doi.org/10.1287/mnsc.39.1.17
Larson, E. W., & Gray, C. F. (2018). Project management: The managerial process (7th ed.). McGraw-Hill Education.
What the BUSI 680 Week 5 instructions ask
Module/Week 5 assigns chapter 5 of Larson and Gray on estimating project times and costs, with one presentation and Quiz 5, and opens Group Discussion Board Forum 3. Each student posts an individual thread that runs 500 to 750 words, shows command of the course material, leans on three peer-reviewed estimating or project management studies at minimum and brings in Scripture; the group's joint reply of 450 to 600 words follows in Module/Week 6. The thread is worth 50 points. Chapter 5's coverage of top-down and bottom-up estimating, the factors that influence estimate quality and techniques such as range and phase estimating gives students a framework for diagnosing estimating problems in their own organizations.
How this BUSI 680 Week 5 example is built
The thread begins with a pattern from the utility's records: design tasks estimated by the engineers who will do them run 30 to 40 percent long. It then explains the pattern in three steps. Buehler, Griffin and Ross's experiments show that people focus on plan-based scenarios and discount past experience when predicting their own completion times. Kahneman and Lovallo's account of forecasting from a plan's own details explains why organizations compound the bias. Halkjelsvik and Jørgensen's review adds that underestimation is the more common finding in engineering and management settings. Practical remedies follow, drawn from chapter 5's estimating guidelines, and the passage from James frames estimates with humility.
BUSI 680 Week 5 grading rubric: where the points go
Forum 3 threads earn their 50 points through accurate application of chapter 5, a length of 500 to 750 words, three or more peer-reviewed studies on estimating and a passage of Scripture that genuinely informs the argument. Graders look for the estimating concepts in the chapter, including top-down and bottom-up approaches, ratio and apportion methods, phase estimating, the influence of planning horizon, people and organizational culture on estimates and the role of contingency and padding, applied to a real or realistic project. Research on estimating bias and remedies shows critical thinking beyond the textbook. A clear recommendation and a question for the group help the collaborative reply that follows.
BUSI 680 Week 5 help: mistakes that cost points
Estimating threads often stop at the observation that estimates are wrong. Push further: explain why they are wrong in a consistent direction and what would correct the bias. Use your organization's own data if you can, even rough figures, since a percentage overrun makes the argument concrete. Distinguish honest optimism from deliberate padding or understatement, since they call for different responses. Draw on the chapter's practical guidelines, such as having the people who do the work estimate it and using historical data, and test them against research. Let Scripture shape the attitude toward estimates, humility about the future, rather than serving as decoration. Keep within 750 words. A small table of planned and actual durations from your own projects is persuasive evidence.
Related BUSI 680 sample papers
Other BUSI 680 weeks
- BUSI 680 Week 1: Forum 1 Thread: Defining Success
- BUSI 680 Week 2: Forum 1 Group Reply: Selection
- BUSI 680 Week 3: Forum 2: Structure and Culture
- BUSI 680 Week 4: Annotated Bibliography: Hybrid PM
- BUSI 680 Week 6: Forum 3 Reply: Schedule Buffers
- BUSI 680 Week 7: Forum 4: Does Risk Planning Pay?
- BUSI 680 Week 8: Forum 4 Reply: Shared Resources
More MBA sample papers
- BUSI 644 Week 5: Forum 3: Does Coaching Work?
- BUSI 645 Week 5: Forum 3: Paid Sick Leave Choice
- BUSI 650 Week 5: Forum 3: Resin Disruption Risk
- BUSI 681 Week 5: Forum 3: Earned Value as Warning
BUSI 680 Week 5 questions, answered
What is BUSI 680 Group Discussion Board Forum 3?
The third group forum: an individual thread of 500 to 750 words in Module/Week 5 on chapter 5 of Larson and Gray, estimating project times and costs, worth 50 points, with the group's shared 25-point response due a week later.
Where can I find a free BUSI 680 Week 5 sample paper?
The full BUSI 680 Week 5 thread is on this page, explaining why task duration estimates run short with research on the planning fallacy and judgment-based predictions, and offering estimating remedies.
What is the planning fallacy?
A habit of predicting that our own work will finish sooner than it does, despite a track record of overruns on comparable jobs, because people focus on the plan for the task rather than on relevant past experience.
How can project managers improve time estimates?
Approaches include basing estimates on historical data from similar tasks, using ranges or three-point estimates rather than single figures, asking estimators to recall past performance and reviewing estimates at each phase.
What else is due in BUSI 680 Module/Week 5?
Quiz 5, open-book with 25 items on estimating and a 45-minute clock, along with chapter 5 of Larson and Gray, one presentation and the start of the group's reply planning.
Use it as a model, or ask for your own
This paper is an original model written by our desk for study. It is not a submitted student paper and not an official Liberty University document. Read it for structure and reasoning, then write your own to the instructions in your Canvas course. If you want a version built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.
Ask for a custom BUSI 680 Week 5 sample · All BUSI 680 weeks · All courses